Laserfiche WebLink
Planning & Zoning Board <br />July 13, 2016 <br />Page 4 <br />APPROVED MINUTES <br />Rob Linser, 6581 Sioux Lane, current housing density match new development density, <br />reduce number of lots. <br /> <br />Mike Trehus, 675 Shadow Court, connect to Birch St, done as soon as possible and <br />concerns of wetlands impacts and costs associated <br /> <br />Jaylee Engebretson, 354 Sioux Court, wondering about 3 quarter intersection at Todom, <br />Mr. Grochala steps in and explains, <br /> <br />Ron Holch, 6599 Hokah Drive, corridor study clarification <br /> <br />Chair Tralle addressed all concerns from the public, starting with pedestrian and traffic, <br />lot and housing price, relocation of power poles, trail access, sidewalk costs, storm pond, <br />density, development profit <br /> <br />Mike Trehus, 675 Shadow Court, variance claimed by developer because of finical <br />constraints <br /> <br />Mr. Evenson made a MOTION to close the Public Hearing at7:40 p.m. Motion was <br />supported by Mr. Masonick. Motion carried 5 - 0. (Tralle abstained) <br /> <br />Mr. Evenson made a MOTION to recommend approval of the St. Clair Estates <br />Preliminary Plat and Variance <br />Motion was supported by Mr. Stoesz. Motion carried 4- 2. (Root and Laden opposed) <br /> <br />B. PUBLIC HEARING CONTINUED to consider Clearwater Creek Business <br />Park Rezoning and PUD Development Stage Plan/Preliminary Plat <br /> <br /> <br />Kendra Lindahl of Landform presented the staff report. Staff recommended approval of <br />the Clearwater Creek Business Park Rezoning and PUD Development Stage <br />Plan/Preliminary Plat. <br /> <br />1. Request to rezone property from General Business (GB) and Light Industrial (LI) <br />to Planned Unit Development (PUD). <br />2. AUAR has been addressed with recommendations <br />3. Developer will extend 21st Ave. and dedicate 40.5 ft. of ROW for Cedar St. <br />4. Traffic study was updated but must be updated to address outstanding AUAR <br />items. <br />5. Site will provide two accesses and an easement will be needed for south drive lot <br />line. <br />6. Floodplain and wetland impact mitigation must be provided. <br />7. PUD will allow outside storage <br />8. Screening to the south has been met with 3 foot rise with landscaping. <br />9. Visual images of building and landscaping are shown. <br />10. East and west wall provided for trash enclosure consistent with building materials.