My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-05-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
06-05-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:00:15 AM
Creation date
6/6/2017 2:19:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/05/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
draft lino lakes 2017-2021 street reconstruction plan 2017v3 5/24/2017 <br /> <br />the issuance of bonds. Notice of such hearing must be published in the official newspaper <br />of the City at least 10, but not more than 28 days prior to the date of the public hearing. <br />The City Council must approve the SRP and the sale of street reconstruction bonds by a <br />unanimous vote of those members present at the meeting following the public hearing. <br /> <br />Voters may petition for a reverse referendum on the issuance of street reconstruction <br />bonds. If a petition bearing the signatures of voters equal to at least 5% of the votes cast <br />in the last general election requesting a vote on the issuance of street reconstruction <br />bonds is received by the City Clerk within 30 days after the public hearing, the City may <br />only issue general obligation street reconstruction bonds after approval by voters at an <br />election. If no petition is submitted, general obligation street reconstruction bonds may <br />be issued without an election. <br /> <br />In subsequent years, the process is repeated annually or as expenditures are completed <br />and new needs arise. <br /> <br />III. PROJECT SUMMARY AND FINANCING <br /> <br />Street reconstruction projects anticipated to be undertaken within the next five years and <br />the estimated costs thereof are set forth in Appendix A. A map of the proposed project <br />streets is included in Appendix B. Those for which street reconstruction bonds are <br />anticipated to be issued are marked with an asterisk in Appendix A and are currently <br />anticipated to include the following: <br /> <br />2018 Street Reconstruction Bond Financed Expenditures – <br /> <br />The 2018 Street Reconstruction Project includes the reconstruction of the following streets; West <br />Shadow Lake Drive, Sandpiper Drive, Shadow Court, LaMotte Drive, and LaMotte Circle, by <br />replacement of curb and gutter as needed, required upgrades of the existing stormwater <br />management system and bituminous surfacing. <br /> <br />General obligation street reconstruction bonds are proposed to be issued in 2018 in an aggregate <br />principal amount of approximately $5,124,000.00 for the costs of the West Shadow Lake Drive <br />Improvements, including Sandpiper and Shadow Court, and the LaMotte Drive Improvements, and <br />the costs of issuing the bonds. Such bonds may be combined with other financing tools, including <br />general obligation improvement bonds, to finance other capital improvements in the City. <br /> <br />The bonding for the West Shadow Lake Drive Improvements and the LaMotte Drive Improvements is <br />expected to occur in 2018 but could happen at any time during the 2017 through 2021 Five-Year <br />Street Reconstruction Plan. <br /> <br />West Shadow Lake Drive Improvements <br />The pavement on West Shadow Lake Drive Sandpiper and Shadow Court is in very poor condition. <br />The roadway is located in a high water table and poorly draining soils are located under and adjacent
The URL can be used to link to this page
Your browser does not support the video tag.