My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2017-043 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2017
>
2017-043 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 11:54:04 AM
Creation date
6/12/2017 4:24:52 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
05/22/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Opening Time: 10:00 a.m. <br />Opening Date: May 10, 2017 <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />BLD TABULATION <br />NORTHPOINTE PARK DEVELOPMENT PROJECT <br />WSB PROJECT NO. 2988-250 <br />I hereby certify that this is an exact reproduction of bids received. <br />Landscape Architect: Candace Amberg <br />Northpointe Park Development <br />City of Lino Lakes, Minnesota <br />Page - 1 of 3 <br />ESTIMATE <br />SUNRAM <br />CONSTRUCTION INC. <br />No. <br />Item Description <br />Quantity <br />Units <br />Unit Price Total Price <br />Unit Price Total Price <br />BASE BID SCHEDULE <br />1 <br />GENERAL REMOVALS AND SITE WORK <br />1 <br />LUMP SUM <br />512,46920 $12,469.20 <br />$11,400.00 $11,400.00 <br />MOBILIZATION & TRAFFIC CONTROL (NOT TO <br />EXCEED 5% OF PROJECT VALUE) <br />2 <br />GENERAL EARTHWORKJSUBGRADE PREP <br />1 <br />LUMP SUM <br />$50,000.00 $50,000.00 <br />$20,800.00 $20,800.00 <br />3 <br />WATER <br />20 <br />MGAL <br />$50.00 $1,000.00 <br />$25.00 $500.00 <br />4 <br />IMPORT AND PLACE COMMON BORROW (LV) <br />1,800 <br />CU YD <br />$8.00 $14,400.00 <br />$21.50 $38,700.00 <br />5 <br />IMPORT AND PLACE SELECT GRANULAR BORROW <br />150 <br />CU YD <br />$30.00 54,500.00 <br />$26.60 $3,990.00 <br />(CV) <br />6 <br />GEOTEXTILE FABRIC TYPE V <br />700 <br />SQ YD <br />$2.50 $1,750.00 <br />$225 $1,575.00 <br />UTILITIES <br />7 <br />ELECTRICAL WORK <br />I <br />LUMP SUM <br />$16,000.00 $16,000.00 <br />$13,260.00 $13,260.00 <br />8 <br />4" PERFORATED DRAINTIL,E IN ROCK TRENCH <br />670 <br />LIN FT <br />$20.00 $13,400.00 <br />$13.75 $9,212.50 <br />9 <br />4" NON -PERFORATED PVC PIPE <br />100 <br />LIN FT <br />$20.00 $2,000.00 <br />$1625 $1,625.00 <br />10 <br />CORE DRILL CONNECTION INTO TURF CB <br />1 <br />LUMP SUM <br />$800.00 $80000 <br />$850.00 $850.00 <br />11 <br />DRAINTILE CLEANOUT <br />13 <br />EACH <br />$200.00 $2,600.00 <br />$350.00 84,550.00 <br />PAVEMENT AND SITE IMPROVEMENTS <br />12 <br />BASKETBALL BITUMINOUS PAVING (RAP -FREE) WITH <br />AGGREGATE CLASS 5 BASE <br />406 <br />SQ YD <br />$35.00 $14,210.00 <br />$33.65 $13,661.90 <br />Northpointe Park Development <br />City of Lino Lakes, Minnesota <br />Page - 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.