My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2017-043 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2017
>
2017-043 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 11:54:04 AM
Creation date
6/12/2017 4:24:52 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
05/22/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />Aliammak <br />May 10, 2017 <br />Mr. Rick DeGardner <br />Director of Parks & Recreation <br />City of Lino Lakes <br />600 Town Hall Center Parkway <br />Lino Lakes, MN 55014 <br />Re: NorthPointe Park Development <br />WSB Project No. 2988-25 <br />Dear Mr. DeGardner: <br />701 Xenia Avenue South 1 Suite 300 1 Minneapolis, MN 55416 1 (763) 541-4800 <br />Bids were received for the above -referenced project on May 10, 2017, and were opened and read aloud. <br />A total of one were received. The bid was checked for mathematical accuracy and tabulated, and there <br />are no errors made on the Proposal Form. <br />The bid tabulation indicates the low bidder as Sunram Construction, Inc., in the amount of $307,648.00 <br />for Base Bid plus all Alternates, which overall was approximately 6% over the engineer's estimate. <br />WSB has worked with Sunram Construction on previous projects and would recommend that the City <br />consider this bid and award a contract to Sunram Construction, Inc. for $280,823.00 to include the base <br />bid and alternates 3 - 6 as detailed below: <br />Base Bid' $239,973 <br />Alternate #3: Export unsuitable soils for court $15,400 <br />Alternate #4: Import select granular borrow for court $21,700 <br />Alternate #5: Remove & replace curb & gutter $1,500 <br />Alternate #6: Remove and replace concrete walk $2,250 <br />Total Contract Amount: $280,823.00 <br />We also recommend setting aside a construction contingency of 10% of the construction budget to allow <br />or any unknowns on the site that may require change to the construction contract. <br />It has been a pleasure working with the City of Lino Lakes on this project and I look forward to seeing this <br />project move into construction. If you have any questions or concerns, please call me directly at (763) <br />231-4848. <br />Sincerely, <br />WSB & Associates, Inc. <br />Candace Amberg, RLA <br />Project Manager <br />Attachments: Bid Tabulation <br />of <br />Building a legacy — your legacy. <br />Equal Opportunity Employer 1 wsbeng.com <br />K:102988-250Wdmin\Construction Admin12988-25 LTR reccomenda0on 051017.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.