Laserfiche WebLink
Extension of Bids <br />STREET AND UTILITY CONSTRUCTION <br />MARSHAN LAKE CONDOMINIUMS <br />CITY OF LINO LAKES, MINNESOTA <br />ANOKA COUNTY, MINNESOTA <br />OSM PROJECT NO. 5521.10 <br />Bid Date: January 18, 1996 <br />10:00 A.M. <br />* Denotes corrected figure. <br />Item 9pso No DaeaptIon Quantity Unit <br />ENGINEER'S <br />ESTIMATE <br />Total BIQ $649,897.00 <br />Unit Primp Item Total <br />LOW BIDDER <br />C.W. HOULE, INC. <br />Total BM: $564,388.40 <br />Unit Pike Item Total <br />2ND BIDDER <br />SJ LOUIS CONSTR., INC <br />Total Bid: $693,277.00 <br />Unit Prins Item Total <br />3RD BIDDER <br />KADLEC EXC. OF MORA <br />Total Bid: • 3902,957.90 <br />Unit Pdos kern Total <br />4TH BIDDER <br />BONINE EXCAVATING, INC. <br />Total Bid: 8917,588.30 <br />Unit Nos Item Total <br />SCHEDULE A: STREETS <br />1 <br />2104.506-00120• <br />REMOVE BITUMINOUS PAVEMENT <br />300 <br />SQ YD <br />$3.00 <br />$900.00 <br />$3.00 <br />$900.00 <br />$3.00 <br />$900.00 <br />$200 <br />$900.00 <br />$2.50 <br />$750.00 <br />2 <br />2104.51340011- <br />SAWING BIT PAVEMENT (FUU. DEPTH) <br />670 <br />UN FT <br />$3.00 <br />$2,010.00 <br />$200 <br />31,340.00 <br />$5.00 <br />33,350.00 <br />34.00 <br />$2,880.00 <br />32.50 <br />*1,675.00 <br />3 <br />2106.501-00016 <br />COMMON EXCAVATION <br />3900 <br />CU YD <br />$3.00 <br />311,700.00 <br />31.35 <br />$5,266.00 <br />3425 <br />$16,575.00 <br />8200 <br />37,800.00 <br />$0.01 <br />$39.00 <br />4 <br />2106.521-00010• <br />GRANULAR BORROW (LV) <br />3000 <br />CU YD <br />37.00 <br />$27,300.00 <br />$0.01 <br />$39.00 <br />$6.85 <br />$22,816.00 <br />3525 <br />320,475.00 <br />80.01 <br />$39.00 <br />6 <br />2112.601-00010. <br />SUBGRADE PREPARATION <br />33 <br />ROAD STA <br />$200.00 <br />38,600.00 <br />$156.00 <br />$5,115.00 <br />8130.00 <br />34,200.00 <br />3100.00 <br />$3,300.00 <br />8123.00 <br />34,069.00 <br />6 <br />2211.50140006 <br />AGGREGATE BASE C1A88 6 (RECYCLED) <br />3120 <br />TON <br />87.00 <br />$21,840.00 <br />88.80 <br />827,456.00 <br />37.00 <br />821,840.00 <br />$825 <br />$25,740.00 <br />86.87 <br />821,434.40 <br />7 <br />2331.514-00036 <br />TYPE 31 BASE COURSE MIXTURE <br />1100 <br />TON <br />$30.00 <br />333,000.00 <br />326.40 <br />827,940.00 <br />$25.00 <br />$27.500.00 <br />324.00 <br />826,400.00 <br />324.70 <br />$27.170.00 <br />8 <br />2331.60800040. <br />TYPE 41 WEARING COURSE MIXTURE <br />390 <br />TON <br />$31.00 <br />812,090.00 <br />$33.00 <br />$12,870.00 <br />$30.00 <br />*11.700.00 <br />$28.00 <br />310,920.00 <br />829.16 <br />311.372.40 <br />9 <br />2631.5001-04110- <br />CONCRETE CURB t GUTTER DESIGN D412 <br />5870 <br />LIN FT <br />38.00 <br />$34,020.00 <br />36.00 <br />$34,020.00 <br />3625 <br />835,437.60 <br />$625 <br />329,767.50 <br />38.13 <br />$34,757.10 <br />10 <br />2367.60240016 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />190 <br />GALLON <br />36.00 <br />3960.00 <br />$1.80 <br />$304.00 <br />31.85 <br />3313.50 <br />$200 <br />3380.00 <br />31.64 <br />8311.80 <br />11 <br />7 <br />251 3.503.00003- <br />SILT FENCE, I <br />REA <br />2000 <br />UN FT <br />$200 <br />$4,000.00 <br />8125 <br />$2,500.00 <br />32.00 <br />34,000.00 <br />31.50 <br />$3.000.00 <br />32.42 <br />34,840.00 <br />12 <br />2873.50640030- <br />SODDING TYPE LAWN (INCL. 4' TOPSOIL) <br />8300 <br />SO YD <br />$200 <br />313,800.00 <br />$1.80 <br />$11,040.00 <br />$1.40 <br />$9,860.00 <br />$1.96 <br />313,456.00 <br />$221 <br />316,249.00 <br />13 <br />2232.50140115- <br />MILL BITUMINOUS SURFACE (1.5') <br />2256 <br />SQ YD <br />3200 <br />84,510.00 <br />$0.80 <br />31,804.00 <br />80.52 <br />$1,172.80 <br />$1.75 <br />$3,94625 <br />80.51 <br />31,150.06 <br />TOTAL SCHEDULE A: STREETS <br />$172,720.00 <br />$130,893.00 <br />$159,663.80 <br />3146,463.76 <br />3122,846.66 <br />SCHEDULES: STORM SEWER <br />14 <br />2501.516-00421. <br />42' RC PIPE APRON W/TRASH GUARD <br />1 <br />EACH <br />82,500.00 <br />$2,500.00 <br />81,700.00 <br />$1,700.00 <br />31,500.00 <br />$1,600.00 <br />81,500.00 <br />81,500.00 <br />31,89600 <br />31.93600 <br />16 <br />2501.51640181. <br />18' RC PIPE APRON W/TRASH GUARD <br />4 <br />EACH <br />8700.00 <br />32,800.00 <br />3880.00 <br />$2,720.00 <br />3840.00 <br />32,580.00 <br />3500.00 <br />$2,000.00 <br />3641.00 <br />82,564.00 <br />18 <br />2503.54140125 <br />12' RC PIPE SEWER DESIGN 3008 CL V <br />140 <br />UN FT <br />$18.00 <br />82,520.00 <br />318.00 <br />82,520.00 <br />$28.00 <br />33.640.00 <br />317.00 <br />$2,360.00 <br />317.30 <br />$2.422.00 <br />17 <br />2503.54140155- <br />16' RC PIPE SEWER DESIGN 3008 Cl. V <br />838 <br />UN FT <br />319.00 <br />$12,12200 <br />$19.60 <br />$12,441.00 <br />823.00 <br />314,674.00 <br />818.00 <br />311,484.00 <br />318.80 <br />$11.994.40 <br />18 <br />2503.54140185- <br />18' RC PIPE SEWER DESIGN 3008 CI. V <br />300 <br />LN FT <br />828.00 <br />38,400.00 <br />$2125 <br />$6,375.00 <br />826.00 <br />$7,600.00 <br />$20.00 <br />$6.000.00 <br />$20.55 <br />$6,193.00 <br />19 <br />2503.54140215 <br />21' RC PIPE SEWER DESIGN 3008 CL V <br />175 <br />UN FT <br />830.00 <br />85,260.00 <br />325.00 <br />$4,375.00 <br />$3200 <br />35.600.00 <br />$30.00 <br />$5,250.00 <br />$24.96 <br />$4,313.75 <br />20 <br />2503.54140243- <br />24' RC PIPE SEWER DESIGN 3006 CL 81 <br />174 <br />LIN FT <br />$30.00 <br />$3,220.00 <br />326.00 <br />84,524.00 <br />$33.00 <br />35,74200 <br />$30.00 <br />85,220.00 <br />32520 <br />84,384.80 <br />21 <br />2503.64140273- <br />27' RC PIPE SEWER DESIGN 3006 Cl. III <br />29 <br />UN FT <br />$93.00 <br />$1,015.00 <br />333.00 <br />$957.00 <br />339.00 <br />$1.131.00 <br />$37.00 <br />31.073.00 <br />$32.20 <br />3933.80 <br />22 <br />2503.54140303- <br />30' RC PIPE SEWER DESIGN 3008 C1.111 <br />283 <br />LIN FT <br />$45.00 <br />$12,735.00 <br />$37.00 <br />810,471.00 <br />339.00 <br />311,037.00 <br />340.00 <br />311,320.00 <br />837.80 <br />310,697.40 <br />23 <br />2503.54140363- <br />36' RC PIPE SEWER DESIGN 3008 CL III <br />268 <br />LIN FT <br />$90.00 <br />$15,980.00 <br />$50.50 <br />$13,433.00 <br />36200 <br />813,832.00 <br />$66.00 <br />814,830.00 <br />$61.95 <br />313.818.70 <br />24 <br />2303.64140423 <br />42' RC PIPE SEWER DESIGN 3008 CL III <br />186 <br />UN FT <br />375.00 <br />$12,375.00 <br />$71.00 <br />811,715.00 <br />373.00 <br />$12,045.00 <br />$80.00 <br />$13,200.00 <br />388.70 <br />311.335.50 <br />26 <br />2506.50802426 <br />CONSTRUCT MANHOLE DESIGN 48-4020 <br />10 <br />EACH <br />81,200.00 <br />$12,000.00 <br />$925.00 <br />$9,260.00 <br />31,200.00 <br />312,000.00 <br />$1,200.00 <br />312,000.00 <br />31,14200 <br />311,420.00 <br />26'2506.50840020. <br />CONSTRUCT MANHOLE DESIGN 60.4020 <br />1 <br />EACH <br />$1,600.00 <br />$1,500.00 <br />$1,650.00 <br />$1,550.00 <br />81,800.00 <br />$1,800.00 <br />32,500.00 <br />$2,500.00 <br />81,571.00 <br />31,671.00 <br />27 <br />2608.508-08620 <br />CONSTRUCT MANHOLE DESIGN 72.4020 <br />2 <br />EACH <br />82,200.00 <br />$4,400.00 <br />$2,800.00 <br />$6,800.00 <br />32,800.00 <br />$5,200.00 <br />82.750.00 <br />36500.00 <br />82,252.00 <br />34,504.00 <br />28 <br />2500.508-04219 <br />CONSTRUCT MANHOLE DESIGN 84-4019 <br />1 <br />EACH <br />$3,300.00 <br />33,300.00 <br />*4,060.00 <br />$4,060.00 <br />$3,500.00 <br />83,500.00 <br />83,500.00 <br />$3,500.00 <br />33223.00 <br />83,223.00 <br />29 <br />2508.502-02426 <br />CONST DRAINAGE STRUCTURE DES 48-4020 <br />8 <br />EACH <br />$1,200.00 <br />89,800.00 <br />$875.00 <br />$7,000.00 <br />31,100.00 <br />88,800.00 <br />31,200.00 <br />39,000.00 <br />$1.117.00 <br />$8.936.00 <br />30 <br />2502.54147040. <br />4' PERF PE PIPE DRAIN <br />400 <br />LIN FT <br />315.00 <br />36,000.00 <br />8720 <br />32,880.00 <br />$3.00 <br />81,200.00 <br />$5.75 <br />82,300.00 <br />$3.82 <br />31,528.00 <br />31 <br />2511.50140013 <br />RANDOM RIPRAP CLASS III WITH TYPE IV <br />GEOTEXTILE FABRIC AND GRANULAR BEDDING <br />20 <br />CU YD <br />$40.00 <br />3800.00 <br />$58.00 <br />31,100.00 <br />$39.00 <br />3780.00 <br />845.00 <br />3900.00 <br />$40.00 <br />$800.00 <br />82 <br />0461.80240046 <br />GRANULAR FOUNDATION AND/OR BEDDING <br />670 <br />TON <br />$5.00 <br />$3,360.00 <br />$0.01 <br />$6.70 <br />$0.01 <br />$6.70 <br />$0.01 <br />36.70 <br />$0.01 <br />36.70 <br />Page 1 of 9 <br />