Laserfiche WebLink
Environmental Assessment Worksheet (EAW) <br />NOTE TO PREPARERS <br />This worksheet is to be completed by the Responsible Governmental Unit (RGU) or its agents. The project proposer must supply any <br />reasonably accessible data necessary for the worksheet, but is not to complete the fmal worksheet itself. If a complete answer does not <br />fit in the space allotted, attach additional sheets as necessary. <br />For assistance with this worksheet contact the Minnesota Environmental Quality Board (EQB) at (612)296-8253 or (toll-free) 1-800-652- <br />9747(ask operator for the EQB environmental review program) or consult "EAW Guidelines," a booklet available from the EQB. <br />NOTE TO REVIEWERS <br />Comments must be submitted to the RGU (see item 3) during the 30 -day comment period following notice of the EAW in the EQB <br />Monitor. (Contact the RGU or the EQB to learn when the comment period ends.) Comments should address the accuracy and <br />completeness of the information, potential impacts that may warrant further investigation, and the need for an EIS. If the EAW has <br />been prepared for the scoping of an EIS (see item 4), comments should address the accuracy and completeness of the information and <br />suggest issues for investigation in the EIS. <br />1. Project Title New Centennial Middle School <br />2. Proposer Centennial Independent School District No. 12 <br />Contact person John McClennan <br />Address District Offices ISD #12 <br />4707 North Road. Circle Pines. MN <br />Phone 612-780-7600 <br />4. Reason for EAW Preparation <br />❑ EIS scoping ® mandatory EAW <br />3. RGU <br />Contact person <br />and title <br />Address <br />City of Lino Lakes <br />David Ahrens. P.E. <br />Public Works Director/City Engineer <br />1189 Main Street <br />Lino Lakes. MN 55014 <br />Phone 612-464-5562 <br />❑ citizen petition <br />❑ RGU discretion ❑ proposer volunteered <br />If EAW or EIS is mandatory, give EQB rule category number(s) 4410-4300 Subp. 14B(2) <br />For construction of a new or expansion of an existing industrial, commercial, or institutional facility, other than a <br />warehousing or light industrial facility, equal to or in excess of the following thresholds, expressed as gross floor space, the <br />local governing unit (LGU) shall be the RGU. <br />Third or fourth class city, 200,000 square feet. <br />5. Project Location <br />S ' SW '4 Section 18 Township 31N Range 22W <br />County Anoka City/Twp Lino Lakes <br />Attach copies of each of the following to the EAW: <br />a. a county map showing the general location of the project; <br />b. copy(ies) ofUSGS 7.5 minute, 1:24,000 scale map (photocopy is OK) indicating the project boundaries; <br />c. a site plan showing all significant project and natural features. <br />6. Description Give a complete description of the proposed project and ancillary facilities (attach additional sheets as necessary). <br />Emphasize construction and operation methods and features that will cause physical manipulation of the environment or produce <br />wastes. Indicate the timing and duration of construction activities. <br />The Centennial Independent School District No. 12 (IDS #12) services the communities of Centerville, Circle Pines, parts of <br />Lino Lakes, and a small portion of Blaine.. District personnel have projected that future student enrollments will require <br />additional space. ISD #12 plans to construct a 226,000 square foot middle school to accommodate 1,800 students. The site <br />plan includes the building with a footprint size of 180,000 square feet, a track and playing fields plus parking areas. ISD #12 <br />has scheduled the construction completion prior to the fall of 1997. <br />ISD#12 .EAW - 1 - <br />