Laserfiche WebLink
Forester. His comments will be available prior to the P & Z <br />meeting. Staff would encourage additional evergreen type plantings <br />on the 35W side of the project. <br />AESTHETIC COMPATIBILITY: The exterior of the proposed constructed <br />is indicated as painted rockface block with a single score block <br />accent. A unique entrance design is planned with a curved front <br />treatment to the building. Color selections are planned earth <br />tones. <br />OFF-STREET PARKING: There are a total of 41 parking spaces shown <br />on the site plan including one handicapped space. Additional <br />parking is planned for the future expansion to the north of the <br />building. The 41 spaces provided exceed the requirements of the <br />ordinance at this time and should be adequate to serve the site. <br />CIRCULATION AND ACCESS: One access .drive is provided to serve this <br />site and the undeveloped property to the south. The drive is <br />proposed to be 40' in width and should adequate serve both parcels. <br />A Shared Driveway Agreement will be required as a condition of <br />approval for this site plan as is the standard practice for <br />development in the Apollo Business Park. <br />LOADING AND TRASH HANDLING: A refuse enclosure has been provided <br />on the south side of the building and will be screened from the <br />public right of way by a 6-8' high enclosure. <br />LIGHTING: The off street parking area must be illuminated so as to <br />reflect light away from the adjoining properties and street right <br />of way. <br />SIGNS: The City Sign Ordinance provides a ground sign closer than <br />20' to the front property line. We would advise the applicant that <br />all signage will require permits and must meet the current sign <br />ordinance requirements. <br />UTILITIES, DRAINAGE AND GRADING: Plans for onsite grading, <br />drainage and utilities will be subject to review and approval by <br />the City Engineer. A 30' easement runs along the easterly property <br />line to carry drainage to an existing ponding area south of this <br />site. This area must be kept free of plantings, parking, and other <br />items that would prohibit the proper function of this drainage <br />easement as determined by the City Engineer. <br />In summary, Staff would concur with EDAB and recommend approval of <br />the Site Plan Review and Minor Subdivision with the following <br />conditions: <br />1. Proper building permits be obtain prior to any <br />construction. <br />4. <br />2. The applicant shall sign a development agreement and <br />post financial guarantees as specified by the City prior <br />to issuance of the building permit. The development <br />