My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/10/1996 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1996
>
04/10/1996 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 12:16:30 PM
Creation date
7/3/2017 3:48:18 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/10/1996
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° j CN,,k( 1) <br />AGENDA ITEM V B C_.•--� <br />STAFF ORIGINATOR Mary Kay Wyland <br />DATE April 5, 1996 <br />TOPIC Northern Wholesale, 6810 Otter Lake Road <br />Site Plan Review & Minor Subdivision <br />Northern Wholesale is requesting a site plan review and minor <br />subdivision to facilitate the construction of a 100,000 square foot <br />office/warehouse and small retailing facility at .the north/east <br />corner of Cedar Street and Otter Lake Road. Approximately 40,000 <br />square feet will be leased and there is an expansion area of 50,000 <br />square feet indicated on the plan. Sewer and water utilities are <br />;currently in place on Cedar Street to serve the proposed <br />construction. <br />The property in question is zoned Light Industrial and indicated as <br />industrial on the City's Land Use Plan. The site contains <br />approximately 9 acres and is proposed to be split from a larger <br />parcel to the east. The Zoning Ordinance requires a 50' setback <br />from both Cedar Street and Otter Lake Road. Additionally, a 40' <br />landscaping buffer, 50% effective,, must be provided when an <br />industrial use abuts a residential area. The Clearwater Creek <br />Residential Development is immediately south on Cedar Street. <br />Cedar Street is currently an unimproved roadway which cannot handle <br />heavy truck traffic. City Staff will be recommending an <br />improvement to this roadway from Otter Lake Drive westerly to the <br />newly constructed Clearwater Creek Drive. The City has some funds <br />to cover this proposed construction from the Developer of <br />Clearwater Creek and will also be assessing Northern Wholesale for <br />a portion of the cost. Until reconstruction of Cedar is realized, <br />Northern Wholesale has been asked to redesign their site plan to <br />provide access for truck traffic off Otter Lake Road. They have <br />complied with this request. However, they are requesting that this <br />arrangement be temporary in nature as truck traffic and access to <br />the loading dock area would be better facilitated, for their use, <br />off Cedar Street. In addition, their proposed expansion is on the <br />north side of the site. Staff would recommended that Northern <br />Wholesale and any future tenant be required to adhere to a schedule <br />that woulAballow delivery and truck traffic limited to the hours of <br />7:00 a.m. to 8:00 p.m. This would minimize disruption to the <br />residential neighborhood south of this site. <br />orthern Wholesale is an owner operated company which has been in <br />operation for 24 years. They are currently located in Maplewood. <br />Their employment base is 50 with an anticipate expansion to 75 <br />following their move to Lino Lakes. EDAB has recommended approval <br />of the project and will be providing TIF Financing to the <br />development of the site. <br />SITE .PLAN REVIEW: <br />SETBACKS: The building is proposed to be constructed 40' from <br />Cedar Street and approximately 220' from Otter Lake Road. The Otter <br />
The URL can be used to link to this page
Your browser does not support the video tag.