Laserfiche WebLink
Program Services <br />Administrative Offices: Open offices, a Director's office, staff meeting room and clerical <br />storage are located in a separate area off the main entrance corridor. The area will be <br />finished with carpet on floors with an acoustic ceiling for sound control. <br />Two Group Supervisor offices are located in the common area, each near the entrance to <br />two housing units. A Central Security desk (free-standing) provides direct visual <br />surveillance of the main entrance, all corridors in the common area, the exercise room, <br />entrances to each housing unit and the multi-purpose room. The Central Security desk will <br />provide electronic monitoring for the building, including security intercom, closed circuit <br />television monitoring and fire alarm annunciation. <br />Multi -Purpose Room: This 2500 square foot room with movable partitions provides for <br />various gatherings, including small group therapy and educational activities for up to 132 <br />residents plus staff, and large group assemblies for up to 270 people. The room will be <br />finished with carpet on floors with an acoustic ceiling for sound control. There is an <br />adjacent storage room for equipment. Toilets and janitor closets are located off the <br />corridor outside the main door to the multi-purpose room. <br />Outdoor Recreation: One asphalt -surfaced basketball/volleyball court is provided outside <br />the main entrance. <br />Building Support <br />An entrance vestibule will be visible from the Central Security desk. <br />A partial basement will be directly connected to the campus utility tunnel system. Here are <br />located the water and gas service, hot water conversion equipment, electrical panels, <br />electronic security system cabinets and computer room. <br />A mechanical/electrical equipment room on the first level provides access to the basement. <br />On the second level there is a mechanical penthouse for heating and ventilation equipment, <br />with exterior gravity hoods for fresh air and exhaust; on air-cooled chiller is located on the <br />first level roof behind the mechanical penthouse. <br />Page 54 <br />