My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/10/1995 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1995
>
05/10/1995 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 9:56:52 AM
Creation date
7/7/2017 9:31:34 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/10/1995
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -05-1995 13:53 <br />Memorarxlum <br />TKDA 612 292 0083 P.04/05 <br />Page 2 May 5, 1995 <br />2. Each of the 14 buildings is shown to be served by a single watermain and sanitary sewer <br />connection. Instead, each of the condominiums within the building should have an individual <br />service. At the very least, manholes should be provided at each lateral to a building. <br />3. Though the capacity of the lift station is limited, sewer stubs should be provided to serve the <br />remainder of the area northeast of the Lake Drive/Aqua Lane intersection. <br />4. The minimum sanitary sewer lateral size diameter is 8". <br />Watermain <br />1. A feasibility study must be prepared to evaluate the adequacy of the existing water system and the <br />impact of the proposed development on the systema. <br />2. If each condominium unit is not served individually, gate valves will be required at each building <br />lateral. <br />3. As part of the Shores of Marsha= improvements, a 12" trunk watermain was installed along the <br />east side of Lake Drive. The Comprehensive Water Plan calls for this 12" trunk watermain to be <br />extended south along Lake Drive and east along Aqua Lane. These trunk watermain <br />improvements must be constructed with this project. <br />Storm Sewer <br />1. A detailed review of the storm sewer system and drainage computation will be completed along <br />with the feasibility study to be prepared for the other improvements. <br />2. A culvert will be required beneath the Stagecoach Trail cul-de-sac. <br />Miscellaneous <br />1. Any approval of this site plan is contingent upon the findings of a detailed feasibility study to be <br />prepared for the proposed site development. <br />If you have any questions, please contact me. <br />JMP/rnha <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.