My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/10/1995 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1995
>
05/10/1995 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 9:56:52 AM
Creation date
7/7/2017 9:31:34 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/10/1995
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -05-1995 13:59 TKDA <br />TKDA <br />612 292 0083 P.05/05 <br />TCLTZ, K1N% DUVALL, MAMMON <br />AND A88OCIATES, INCORPoAATRb <br />ENGINEER$ ' ARC urrt era . PLANNERS <br />MEMORANDUM <br />Mary Kay Wyland, <br />Planning c>nr Reference: <br />To: <br />150e PIIEFIJAFFRAY PLAZA <br />444 OEDAR $'THEFT <br />SANT PAUL !MINNESOTA 66171-2148 <br />PNOIIE 8121222 44c0 FA7Cmata44-0o99 <br />$ltd Plan -view <br />Copies To: Alan &bUus. 3 C Re hbe nl MXISiat <br />From: JONI rcgira4lf <br />Date: May 4.1995 <br />62981lod2snn Road <br />Lino LakerLiktinnonta <br />Commission No. 10414-95Q <br />We have reviewed the site plan dated May 26, 1994 prepared for the referenced property. Our <br />comments are as follows: <br />1, T'he plan does not show the existing topography for the site. Although the plan also does not show <br />any proposed grading it does indicate an area of "additional pang". If this area is dated by <br />placing gravel in what is currently a grassy area, the amount of impervious surface will be <br />increased and also the amount of runoff leaving the site. The runoff rate from the site must not <br />increase. <br />2. There is a Iarge hill immediately south of the site in question which was created as part of the Fax <br />Trace project. Any site landscaping must take the presence of this hill into account <br />3. The City has obtained a permanent easement for utility purposes and a temporary easement for <br />constmctinn purposes along tate west edge of this property as part of the Hodgson Road trunk <br />watennain project. These easements are not shown. <br />4. The location of any existing on-site sewer systems is not shown. It cannot be determined if it is <br />affected by the proposed additions. <br />5. The timing of the proposed construction is not given. It must be coordinated with the trunk <br />watermain project to be constructed this sustuner. <br />If you have any questions, please contact me. <br />JMPfnnha <br />TOTAL P.43F <br />
The URL can be used to link to this page
Your browser does not support the video tag.