My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/10/1995 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1995
>
05/10/1995 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 9:56:52 AM
Creation date
7/7/2017 9:31:34 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/10/1995
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. All buildings on site must coordinated as to color scheme <br />and brick treatment. Plans to be submitted at time of <br />building permit review. <br />3. A 15' easement for trail purposes is to be provided along <br />the front property line connecting with the Fox Trace Trail <br />immediately south of the Rehbein Transit Site. The trail <br />shall be graded and rocked per City Trail standards. The City <br />will provide bituminous surfacing in the Fall of 1995. <br />4. Landscaping shall be reviewed and approved by the City <br />Forester prior to issuance of building permits and shall <br />include treatment of the fuel area and front property line. <br />The plan shall be modified to provide screening that <br />coordinates with the trail system. It is suggested that <br />plantings be grouped rather than evenly disbursed. <br />5. The additional parking area noted on the plan dated 5-26-94 <br />shall be provided with a dustless, durable surface (gravel is <br />acceptable). <br />6. Grading of the site shall be reviewed and approved by the <br />City Engineer. Future increase in impervious surfaces shall <br />require review and approval of the City Engineer. <br />7. Timing of the proposed construction must be coordinated <br />with the trunk watermain project to be constructed this <br />summer. <br />{� rn <br />OPTIONS <br />Pccr <br />1. Approve conditional use permit and site plan with conditions <br />listed above. <br />2. Return to staff for further consideration. <br />............................................................. <br />RECOMMENDATION <br />Option 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.