Laserfiche WebLink
5. Ground cover must be established on disturbed portions of the construction site within six <br />months of issuance of the building permit. <br />Subd. 33. Land Reclamation and Grading <br />This subdivision should exempt soil excavation for basements for home construction. <br />Subd. 35. Metes and Bounds Conveyance <br />This subdivision should be addressed in the Subdivision Ordinance. <br />Other General Provisions Topics to be Considered <br />1. Glare <br />2. Smoke, Dust and Particulated Matter <br />3. Odors <br />4. Noise <br />5. Junked Vehicles <br />6. Sewage Disposal <br />7. Waste <br />8. Bulk Storage Liquids <br />SECTION 8 - PARKING <br />The parking requirements should be included or closely follow the general provisions of the <br />Zoning Ordinance for ease of application. The following additions should be considered: <br />1. Purpose for the section. <br />2. Required site plan for parking areas. <br />3. Combine access and driveway standards with parking. <br />4. Provision that allows for shared curb cuts. <br />5. Parking deferment. <br />6. Use restriction in parking areas. <br />7. Parking space requirements should not be listed by zoning district. Uses like churches and <br />schools are allowed in various zoning districts. <br />Subd. 6. Off -Street Loading <br />Provision 2, minimum loading berth size, does not accommodate the typical semi -truck or trailer. <br />9 <br />