My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/21/1994 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1994
>
07/21/1994 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 12:25:34 PM
Creation date
7/7/2017 11:17:53 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/21/1994
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The City of Lino Lake proceed with the replat of the balance <br />of the industrial park in August 1994 to redefine property <br />lines, vacate existing easement, and clarify legal <br />descriptions for the remaining land. <br />2. After the property sale, UDOR be requested to participate in <br />the industrial park replat to clear up the legal description <br />and vacate existing easement locations for the UDOR site. <br />3. The City develop a description for an access easement for <br />shared driveway to run the length of the lot line between <br />Parcel A and Parcel C of the minor subdivision. This access <br />easement must be recorded with the minor subdivision. <br />4. Ten foot utility easement be identified along all lot lines of <br />Parcel A. <br />5. A formal survey document be prepared by the city that <br />illustrates the proposed subdivision and is recordable with <br />Anoka County. <br />ISSUES AND ANALYSIS <br />Section 1001.2 (13) of the Lino Lake Subdivision Ordinance defines <br />a minor subdivision as follows: <br />(13) Minor Subdivision - a subdivision which results in four (4) or <br />fewer parcels, tracts, or lots from one (1) or two (2) <br />existing parcels, tracts, or lots. (Amended by Ordinance No. <br />04 - 90, passed May 29, 1990) <br />The proposed UDOR Subdivision is consistent with the minor <br />subdivision definition. <br />Property Ownership. All the property involved is owned currently <br />by the City of Lino Lakes. With the approval of the minor <br />subdivision, the City will convey the newly created Parcel A to <br />UDOR USA for the development of a first phase 6,000 square foot <br />industrial facility. The ultimate building development will be <br />12,000 square feet in area. The balance of the land involved will <br />be retained by the City and will be included in new subdivision of <br />the Lino Lakes Industrial Park scheduled to be reviewed by the <br />Planning Commission in August 1994. <br />Subdivision Configuration. The proposed subdivision intends to <br />subdivide portions of existing Lots 7 and 8, Block 2, Lino <br />Industrial Park that remain after the realignment of the Apollo <br />Drive right-of-way. The proposed subdivision will create the UDOR <br />lot (Parcel A) and a lot remnant that is intended to be replatted <br />with the balance of the industrial park in August. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.