My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/28/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
08/28/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 3:32:34 PM
Creation date
7/10/2017 2:59:29 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/28/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-SEN <br />August 25, 1995 <br />Mr. Dave Ahrens, P.E. <br />City of Lino Lakes <br />1189 Main Street <br />Lino Lakes, MN 55014 <br />Dear Mr. Ahrens: <br />3535 VADNAIS CENTER DRIVE, 200 SEH CENTER, ST PAUL, MN 55110 612 490-2000 800 325-2055 <br />ARCHITECTURE • ENGINEERING • ENVIRONMENTAL • TRANSPORTATION <br />RE: Lino Lakes, Minnesota <br />49/23 Road Improvements <br />SEH No. A-LINOL1310.00 <br />We have reviewed the construction cost breakdown, design fees, and overhead and right of way <br />costs. <br />The cost participation is summarized below: <br />MnDOT County Lino Lakes Circle Pines <br />Roadway Construction <br />Traffic Control Signal <br />Construction Contingency <br />Design Costs <br />Construction Observation <br />Overhead <br />ROW <br />$567,105.34 <br />75,000.00 <br />56,710.00 <br />0.00 <br />49,900.00 <br />0.00 <br />0.00 <br />$456,116.75 <br />37,500.00 <br />45,610.00 <br />0.00 <br />40,140.00 <br />0.00 <br />0.00 <br />$120,700.69 <br />37,500.00 <br />12,070.00 <br />222,200.00 <br />10,620.00 <br />56,000.00* <br />20,000.00* <br />$1,641.72 <br />0.00 <br />160.00 <br />14,800.00 <br />144.00 <br />0.00 <br />0.00 <br />Totals: <br />$748,715.34 $579,366.75 $479,090.69 $16,745.72 <br />* Figures taken from the Feasibility Report. Actual costs must be verified with City Staff. <br />Please note that the cultural investigation fees have not been included. We will revise this <br />breakdown as soon as we receive these figures. <br />If you have any questions concerning this please contact me at 490-2081. <br />Sincerely, <br />1» /1/-t4 <br />l <br />Steven F. Heth, P.E. <br />SHORT ELLIOTT <br />HENDRICKSON INC. <br />MINNEAPOLIS, MN ST. CLOUD, MN <br />CHIPPEWA FALLS, WI <br />EQUAL OPPORTUNITY EMPLOYER <br />MADISON, WI <br />LAKE COUNTY, IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.