My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-05-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
07-05-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:06:08 AM
Creation date
7/19/2017 4:54:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/05/2017
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Billing and <br />Payment Part of this proposal includes the commissioning of Ross products and on-site training, to make sure that Lino <br />Lakes staff knows how to use the features of this technology. The required services are included in cost total <br />below, but the additional travel and accommodation costs will be in added to the final invoice. <br />Protect Your Investment with an Annual Service Contract <br />Technology is ever changing, and maintenance issues arise from time to time. <br />Bronze Level Service Contract: Phone support only. On-site visits will be billed on a time and materials <br />basis. $1,936 (one year) <br />Silver Level Service Contract : On-site per-incident support and phone support. $3,372 (one year) <br />Gold Level Service Contract: In addition to per-incident support, we regularly visit your facility to do <br />preventative maintenance to ensure maximum uptime for your system. $4,816 (one year) <br />Payment Terms <br />50% down payment with the signed contract is required to commence this project. Upon substantial <br />completion, an invoice for the balance due will be submitted with net 15 day terms. <br />Cost Breakdown <br />Ross Lightning Control System and Carbonite Switching System $27,329 <br />Ross PIVOTCam and Controller (4)$18,512 <br />Podium Equipment $4,707 <br />Video Monitoring System $5,920 <br />Council Dais $7,186.50 <br />Master Control $18,203 <br />Installation Materials $9,970 <br />Ross Commissioning and Training Services $11,375 + travel and accommodation <br />Installation Labor (lot –per scope above)$34,214 <br />Z Systems “Design and Build” Package Discount -$15,824.57 <br />Total Cost $119,967 * <br />Z Systems, inc, 3724 Oregon Ave. South • St. Louis Park, MN 55426-4339 • (952) 974-3140 • zsyst.com <br />•Does not include Ross travel and accommodation <br />•Shipping charges will be added to final invoice. <br />Lino Lakes City Council Chambers Upgrade June 27, 2017 Page 9 <br />Ross Commissioning and Training Services (required)
The URL can be used to link to this page
Your browser does not support the video tag.