Laserfiche WebLink
Project Scope <br />& Overview Tear-out of existing equipment and wiring infrastructure. Equipment to be stacked to one side with no further <br />attention given it. Wiring to be discarded on-site. Some installed wiring, such as for speakers, may be retained. <br />Break-down and removal of legacy Master Control video system furniture. Furniture to be stacked in a nearby <br />location with no further attention given it. <br />Misc. vacuuming of Master Control floor as required. <br />Misc. labeling of inter-room conduit runs as required. <br />Preparation <br />Staging and Wiring <br />Staging of materials and load-in to jobsite. <br />Cable pull of new wiring between Master Control and Council Chambers. <br />Council Chambers <br />Unpacking and installation/placement of new equipment, as indicated on CAD drawings. Some legacy equipment, <br />such as audio speakers, may be re-used depending on final equipment configuration. <br />Labeling and dressing of power cords. <br />All wiring, as indicated on CAD drawings. <br />Misc. labeling of equipment. <br />Coordination with Lino Lakes IT on user account and installed software for Podium PC. <br />Master Control <br />Unpacking & assembly of new console and rack. <br />Unpacking & rack-up of new equipment. <br />Installation of rack and console power strips as required. <br />Labeling and dressing of new equipment power cords. <br />All wiring, as indicated on CAD drawings. <br />Conversation with customer regarding recording format to be used on file recorder and DVD-R. <br />Configuration of settings on file recorder and DVD-R, as determined by conversation with customer. <br />Misc. labeling of equipment as required. <br />Continued on next page <br />System Diagrams <br />See CAD drawings in the collection <br />"COUNCIL CHAMBERS <br />REDESIGN," prepared by Z <br />Systems: <br />CONSOLE ELEVATION - <br />MASTER CONTROL <br />BLOCK DIAGRAM -DAIS MICS <br />AND SCREENS <br />BLOCK DIAGRAM -CAMERAS <br />AND PODIUM <br />BLOCK DIAGRAM -MASTER <br />CONTROL ROSS <br />BLOCK DIAGRAM - <br />OUTBOARD GEAR <br />Z Systems, inc, 3724 Oregon Ave. South • St. Louis Park, MN 55426-4339 • (952) 974-3140 • zsyst.com <br />Lino Lakes City Council Chambers Upgrade June 27, 2017 Page 6