Storm sewer. Stormwater runoff is divided and is directed into two separate <br />directions. The east half of the roadway will drain to the re -aligned Otter Lake <br />Road storm sewer system. The west half of the roadway will be directed into a <br />proposed pond or existing ditch. Regional ponding is planned for this area and <br />every attempt will be made to maintain buildable land for development. <br />Street. The proposed roadway consists of a 9 -ton, 32 -foot wide section with <br />concrete curb and gutter. Preliminary soils information indicate poor subgrade <br />soils and the need to improve these soils by installing a 2 -foot thick granular <br />subbase. Curb cuts will be provided and located per property owners direction. <br />The roadway will include the filling of a wetland. Mitigation for this filling will <br />require a permit from Rice Creek Watershed District. Staff has discussed <br />regional ponding and wetland mitigation with Rice Creek Watershed District with <br />a favorable response from the District. <br />Project Costs <br />The street design was recently discussed with the City's consulting engineer with the <br />design of the road section changing slightly. Therefore, revised project costs and <br />estimated assessments will be presented at the public hearing. <br />Project Schedule <br />The proposed schedule for the project is as follows: <br />Order Project <br />Council Approves Plans <br />Council Authorizes Ad for Bids <br />Bid Opening <br />Council Awards Bid <br />Construction Begins <br />Substantial Completion <br />Assessment Hearing <br />OPTIONS: <br />1. Continue the public hearing. <br />2. Close the public hearing. <br />RECOMMENDATION: <br />Option 2. <br />December 16, 1996 <br />January 27, 1997 <br />January 27, 1997 <br />February 24, 1997 <br />February 24, 1997 <br />April 11, 1997 <br />June 27, 1997 <br />October 1997 <br />