My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-07-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
08-07-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:10:08 AM
Creation date
8/8/2017 12:09:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/07/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Water Storage Siting Study <br />City of Lino Lakes <br />WSB Project No. 2988-44 Page 10 <br />Table 5 – Concrete Ground Storage Reservoir and Booster Station Estimated 50-Year Life Cycle Cost <br />Item Quantity Unit Unit Cost Total Cost <br />1.5 MG Concrete Ground Storage <br />Reservoir and Booster Station 1 EA $5,393,600 $5,393,600 <br />Land Purchase Cost for Ground <br />Storage Reservoir and Booster <br />Station <br />1.5 Acre $100,000 $150,000 <br />Replace Booster Station Pumps <br />Every 25 Years 2 EA $211,000 $422,000 <br />Replace Booster Pump Station <br />VFDs and Switchgear Every 25 <br />Years <br />2 EA $80,000 $160,000 <br />Heating and Cooling of Booster <br />Station 50 EA $2,400 $120,000 <br />General Booster Station Building <br />Maintenance 40 EA $5,000 $200,000 <br />Subtotal $6,445,600 <br />Engineering, Bidding, and <br />Construction Services (8%) $515,648 <br />Total Estimated 50-Year Cost $6,961,248 <br /> <br /> <br />4.3.2 1.5 MG Fluted Column Water Tower <br />The estimated 50-year life cycle cost for a 1.5 MG Fluted Column Water Tower is presented in Table 6. It <br />was assumed that the steel surfaces on the fluted column style water tower and the composite water <br />tower would be blasted and recoated once every 15 years. <br /> <br />Table 6 – 1.5 MG Fluted Column Water Tower Estimated 50-Year Life Cycle Cost <br />Item Quantity Unit Unit Cost Total Cost <br />1.5 MG Composite Water Tower 1 EA $3,475,000 $3,475,000 <br />Associated Site Work 1 LS $300,000 $300,000 <br />Land Purchase for Water Tower <br />Site 1.5 ACRE $100,000 $150,000 <br />Sandblast and recoat interior and <br />exterior of steel bowl every 15 <br />years 3 EA $1,200,000 $3,600,000 <br />Subtotal $7,525,000 <br />Engineering, Bidding, and <br />Construction Services (5%) $376,250 <br />Total Estimated 50-Year Cost $7,901,250 <br /> <br />4.3.3 1.5 MG Composite Water Tower <br />The estimated 50-year life cycle cost for a 1.5 MG Composite Water Tower is presented in Table 7. It was <br />assumed that the steel surfaces on the composite style water tower and the composite water tower would <br />be blasted and recoated once every 15 years. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.