will be assessed the cost of the a standard lot in that area -basically for a 90' lot even if their lot is larger. <br />If they later sub -divide and more lots are eventually laid out these new lots would also be assessed. After <br />all is said and done the city will recapture/assess all the costs that were laid out initially. <br />From Peter - <br />How could we convince the public to vote to reduce the power of section 8. <br />From Council member Reinert - <br />We have to look at what are we changing it to? <br />How do you sell it to the residents? <br />It has to be recognized that even if replacing streets regularly we have to remember that if streets last 40- <br />60 years and we have 100 miles that means we have 1-2 miles to reconstruct annually on average. <br />We've only reconstructed one in the last 20 years! We have to get going on this. Many of our streets are <br />pretty new but we will have a period in time where a large amount of streets will need to be <br />reconstructed. <br />Safety question raised by Cheryl: <br />At what point is a street so bad that the state or city would shut it down? <br />Basically it can never come to this. From a liability standpoint signs are posted and they are advised to <br />keep the referendum on the ballot to protect themselves. <br />Brainstorming: <br />People may be willing to change the charter but need assurance that the "heart of the charter" is still in <br />place. Large property owners are still concerned about the possibility of a large assessment. <br />Reinert: Maybe a systematic method of putting on the ballot each time the option to fund a fund or to <br />change the referendum could be considered. If people see this coming up in front of them every time and <br />the opportunity to change to a more efficient financing method each time, they may learn over time to <br />just change the charter and be done with it. <br />After the initial feasibility study the assessment cost that is quoted cannot be exceeded. It is difficult to <br />come up with a figure to put in the study when the dollars aren't actually spent for several years. It must <br />be realized that everything goes into the study as it can't be exceeded. It has to be passed before the <br />final budgets and meetings are put in place. Once the referendum is passed then is the time to finalize <br />the plan. <br />Referendum only approves the financing. The plan/project still isn't approved until after the referendum <br />when the city council approves the plan. It is a leap of faith that is there for people to agree with the <br />referendum (pass it) and trust that when the final plan comes in all the adjustments will be there to <br />satisfy the residents. <br />Maximum amount that can be assessed is determined by the increase in property value. With that <br />amount limited you will end up with varying percentages assessed. This varying percent leads to the <br />perception of inequality between the proposals. <br />Michael indicated that right in feasibility study it has been considered to lay out that the open issues will <br />be addressed in the final plan. This could give the assurance to the affected that more input will be <br />considered and finalized before it is all said and done. <br />Council member brought up the issue of the expense of the feasibility studies. <br />