My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-06-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 12:27:44 PM
Creation date
12/7/2017 12:06:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rice Creek Chain of Lakes Park Reserve Rice Creek Chain of Lakes Park Reserve <br />projects, but it is generally anticipated to be within the next 5-15 years. With this amendment, the County <br />proposes to include all projects outlined in the Wargo Nature Center Master Plan from March 2015 into the <br />park's overall master plan. The other proposed projects for the park reserve include: <br />• Making improvements to the Peltier Lake fishing access <br />• Adding alternative camping accommodations to Rice Creek campground <br />• Stormwater management <br />improvements to address <br />drainage issues within the <br />campground. <br />• Adding a self-service <br />canoe/kayak rental program <br />and establishing an access point <br />at the campground <br />• Creating an interpretive area <br />near a burial mound <br />• An additional Fishing <br />Access/Pier on Centerville Lake <br />• Create additional multi -use <br />trails and connections to local <br />neighborhoods <br />• Moving the existing compost <br />site out of the park, but <br />allowing the ingress road to <br />remain within the park <br />boundary <br />• Continuing to improve the <br />maintenance facilities within <br />the park reserve to optimize <br />operating efficiencies. <br />These projects are highlighted in Figure <br />5, the development concept map. <br />10 <br />ompost <br />(proposed <br />Facility <br />relocation} <br />Wargo Nature <br />(improvements proposed) <br />Launch <br />ishing Pier! <br />Access <br />(improvments <br />Campground <br />(improvements <br />proposed) <br />Picnic Pavilion <br />Beach/Swimming <br />Boat Launch <br />proposed) <br />Interpretive <br />(improvments <br />proposed) <br />Maintenance Facility <br />(I ,r,v. spr,,, <br />Legend <br />— PAVED PARK TRAIL <br />— — PROPOSED PAVED PARK TRAIL <br />UNPAVED PARK TRAIL <br />PROPOSED UNPAVED PARK TRAIL <br />— EXISTING REGIONAL TRAIL <br />- EXISTING CITYTRAL <br />ROADWAY <br />PARK RESERVE <br />WATER <br />Development <br />Rice Creek Chain of Lakes Park Reserve <br />Development Concept <br />Figure 5 <br />05 <br />N <br />Date 101022017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.