Laserfiche WebLink
Table of Contents <br />EXECUTIVE SUMMARY 1 <br />1 INTRODUCTION 2 <br />1.1 Project Location 2 <br />1.2 Drainage Areas and Resources of Concern 2 <br />1.3 Water Resources Design Criteria 3 <br />1.3.1 Lino Lakes Comprehensive Plan 3 <br />1.3.2 Northeast Lino Lakes Alternative Urban Areawide Review 3 <br />1.3.3 Resource Management Plan (RMP) 3 <br />1.3.4 Special Area Management Plan (SAMP) 4 <br />1.3.5 Regulations and Policies 4 <br />1.3.6 Regulatory Requirement Overview 5 <br />2 EXISTING CONDITIONS 6 <br />2.1 City of Hugo 6 <br />2.2 City of Lino Lakes 6 <br />2.3 Existing Land Uses 6 <br />2.4 Soils and Geology 7 <br />2.5 Groundwater 7 <br />2.6 Surface Water Hydrology 7 <br />2.6.1 I -35E Construction 7 <br />2.6.2 Drain tile systems 7 <br />2.6.3 Wetlands 8 <br />2.7 Cultural Resources 8 <br />3 HYDROLOGIC AND HYDRAULIC Analyses 9 <br />3.1 Hydrology 9 <br />3.2 Upper Rice Creek 10 <br />3.3 Clearwater Creek 11 <br />3.4 Hardwood Creek 12 <br />3.5 Rice Creek HEC -RAS 13 <br />4 PROPOSED IMPROVEMENTS 14 <br />5 PROPOSED CONDITIONS MODELS 15 <br />5.1 Hydrology Updates 15 <br />5.2 Hydraulic Updates 16 <br />5.2.1 Upper Rice Creek InfoSWMM — Proposed Conditions 16 <br />5.2.2 Clearwater Creek InfoSWMM — Proposed Conditions 17 <br />5.2.3 Hardwood Creek InfoSWMM — Proposed Conditions 18 <br />5.2.4 Rice Creek HEC -RAS — Proposed Conditions 18 <br />6 RCWD RULE C REQUIREMENTS 19 <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />