Laserfiche WebLink
6.1 Rule C Overview 19 <br />6.2 Water Quality Treatment [RCWD Rule C.6] 19 <br />6.2.1 Volume Reduction Practices 20 <br />6.2.2 NURP Basins 20 <br />6.2.3 Additional BMPs for Consideration of Future Development 21 <br />6.3 Peak Stormwater Runoff Control [RCWD Rule C.7] 21 <br />6.3.1 Allowable Peak Discharges 21 <br />6.3.2 Flood Control Storage 21 <br />6.3.3 Outlet Control Structures 22 <br />6.3.4 Low Floor and Low Entry Freeboard REquirements 22 <br />7 CSMP STORMWATER MANAGEMENT 23 <br />7.1 Regional BMP Capacity Analysis 23 <br />7.2 Operation and Maintenance 23 <br />8 Future Development Submittals 24 <br />8.1 Interim Conditions 25 <br />9 References 26 <br />List of Appendices <br />Appendix A — Figures <br />Figure 1. Location Map <br />Figure 2. Existing Land Uses <br />Figure 3. Drainage Areas and Resources of Concern <br />Figure 4. Lino Lakes Full Build Land Use <br />Figure 5. Lino Lakes Resource Management Plan <br />Figure 6. Lino Lakes Park, Greenway and Trail System <br />Figure 7. Lino Lakes I -35E AUAR Area <br />Figure 8. CSMP Soils <br />Figure 9. CSMP Surficial Geology <br />Figure 10. InfoSWMM Model Updates <br />Figure 11. Proposed InfoSWMM Model <br />Figure 12. Infiltration Suitability <br />Appendix B — Existing Modeling Inputs and Results <br />Appendix C — CSMP Regional System Conceptual Design <br />Appendix D — Proposed Modeling Inputs and Results <br />Appendix E — Total Phosphorus Event Mean Loading Calculations <br />Appendix F — CSMP Design Standards by Parcel <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />