My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-06-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 12:27:44 PM
Creation date
12/7/2017 12:06:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3-4. Clearwater Creek Model Outflow Summary [cfs] <br />CWC NODE <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />J3MT_001 <br />2.7 <br />3.8 <br />5.0 <br />4.3 <br />RCWD 2014 <br />201.8 <br />337.8 <br />563.9 <br />446.0 <br />Revised Existing <br />217.3 <br />350.0 <br />566.0 <br />443.6 <br />Difference [cfs] <br />15.5 <br />12.2 <br />2.2 <br />-2.4 <br />Finally, the CWC model includes the existing flows entering Lino Lakes from Hugo under Elmcrest <br />Avenue. Table 3-5 summarizes the existing flows entering the CSMP study area. <br />Table 3-5. City of Hugo Existing Outflows [cfs] <br />CWC LINK <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />CA55MTL_013 <br />2.7 <br />3.8 <br />5.0 <br />4.3 <br />CA55MTL_012 <br />0.3 <br />1.2 <br />3.6 <br />1.6 <br />CA55MTL_011 <br />1.8 <br />6.8 <br />21.5 <br />6.4 <br />CA55MTL_014 <br />5.2 <br />9.9 <br />16.4 <br />12.5 <br />CA55MTL_014B <br />0.0 <br />0.8 <br />5.9 <br />2.8 <br />TOTAL HUGO <br />10.0 <br />22.5 <br />52.4 <br />27.6 <br />3.4 Hardwood Creek <br />The HWC model was updated to split existing catchment SMT_002 into SMT_002 and SMT 002.5. The <br />soils data for subcatchment SMT_004A was updated to reflect the subcatchment hydrologic input data. <br />The HWC model was unstable when first run, the initial water surface elevation at the outlet node OUT <br />(El. 885.67) was higher than the next two upstream nodes' starting water surface elevations, creating a <br />backflow from Peltier Lake into Hardwood Creek. The lower HWC model nodes were adjusted, per Table <br />3-6, to prevent water from backing up into the system at the start of the model runs. <br />Table 3-6. HWC Initial Water Surface Elevation Corrections <br />INFOSWMM RCWD 2014 <br />NODE INVERT ELEV <br />RCWD 2014 REVISED INVERT <br />INITIAL WSEL ELEV <br />ELEV. <br />REVISED INITIAL <br />WSEL ELEV. <br />OUT 860 <br />885.67 882 <br />885.67 <br />JMT_001 <br />882.44 <br />885.19 <br />882.44 <br />885.67 <br />JMT_002 <br />881.66 <br />885.18 <br />881.66 885.67 <br />JMT_003 883.1 <br />883.96 883.1 885.96 <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.