Laserfiche WebLink
INFOSWMM RCWD 2014 <br />NODE INVERT ELEV <br />RCWD 2014 <br />INITIAL WSEL <br />ELEV. <br />REVISED INVERT REVISED INITIAL <br />ELEV WSEL ELEV. <br />JMT_004 <br />883.25 <br />886.11 <br />883.25 <br />886.11 <br />J MT_005 <br />883.64 <br />886.114 <br />883.64 <br />886.114 <br />JMT_006 <br />884.49 <br />886.357 <br />884.49 <br />886.357 <br />Finally, the inflow hydrograph from the URC model node LEAVING_SYSTEM2 was input at junction node <br />JM_016 in the HWC model as ACD72_LEAVE2_100YR. The HWC model was re -run and the total inflow <br />hydrograph at junction JMT_001 was exported from InfoSWMM and imported into the existing conditions <br />HEC -RAS model at RS 125004.6. <br />Table 3-7. Hardwood Creek Model Outflow Summary [cfs] <br />HWC NODE <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />JMT_001 <br />RCWD 2014 <br />80.7 <br />202.5 <br />685.6 <br />932.0 <br />Revised Existing <br />99.8 <br />214.3 <br />669.3 <br />903.2 <br />Difference [cfs] <br />19.1 <br />11.7 <br />-16.3 <br />-28.8 <br />3.5 Rice Creek HEC -RAS <br />The existing conditions HEC -RAS model was updated with the inflow hydrographs from all the InfoSWMM <br />models and re -run to establish the existing water surface elevations in Peltier Lake for the CSMP study <br />and the results are summarized in Table 3-8. <br />Table 3-8. Peltier Lake Stage Summary [ft] <br />Due to the relatively minor changes in stage at Peltier Lake, it was assumed that re -importing the stage <br />hydrograph into the InfoSWMM models would result in negligible changes to the overall InfoSWMM <br />results. As a result, the Peltier Lake stage data was not updated in the revised existing conditions <br />InfoSWMM modeling and the models presented above were used as the baseline existing conditions. <br />Detailed input and result tables from the existing conditions modeling may be found in Appendix B. <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 13 <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />PELTIER LAKE <br />STAGE <br />RCWD 2014 <br />885.73 <br />886.28 <br />887.20 <br />887.53 <br />REVISED EXISTING <br />885.76 <br />886.41 <br />887.22 <br />887.51 <br />DIFFERENCE [FT] <br />0.03 <br />0.13 <br />0.02 <br />-0.02 <br />Due to the relatively minor changes in stage at Peltier Lake, it was assumed that re -importing the stage <br />hydrograph into the InfoSWMM models would result in negligible changes to the overall InfoSWMM <br />results. As a result, the Peltier Lake stage data was not updated in the revised existing conditions <br />InfoSWMM modeling and the models presented above were used as the baseline existing conditions. <br />Detailed input and result tables from the existing conditions modeling may be found in Appendix B. <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 13 <br />