Laserfiche WebLink
URC NODE <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />Proposed <br />0 <br />0 <br />0 <br />0 <br />Difference [cfs] <br />0 <br />0 <br />-0.1 <br />0 <br />PELTIER_LAKE <br />2.1 <br />7.3 <br />17.7 <br />6.4 <br />Revised Existing <br />1,448.8 <br />2,523.1 <br />4,426.6 <br />896.4 <br />Proposed <br />1,069.3 <br />2,032.3 <br />4,128.4 <br />856.4 <br />Difference [cfs] <br />-379.5 <br />-490.8 <br />-598.2 <br />-40.1 <br />With the reconfiguration of the URC model now including the re-routing of ACD 55 main trunk and Branch <br />8, the flows entering from the City of Hugo are now included in this model. A summary of the Hugo flows <br />entering the City of Lino Lakes is presented in Table 5-4. <br />Table 5-4. City of Hugo Proposed Outflows [cfs] <br />URC LINK <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />CA55MTL_013 <br />2.0 <br />3.5 <br />5.0 <br />4.3 <br />CA55MTL_012 <br />0.3 <br />1.2 <br />3.3 <br />1.6 <br />CA55MTL_011 <br />2.1 <br />7.3 <br />17.7 <br />6.4 <br />CA55MTL_014 <br />3.6 <br />8.3 <br />13.9 <br />12.5 <br />CA55MTL_014B <br />0.0 <br />0.1 <br />3.9 <br />2.8 <br />TOTAL HUGO <br />8.0 <br />20.4 <br />43.8 <br />27.6 <br />The flows leaving the City of Hugo are somewhat decreased from the existing conditions due to the <br />conversion of agricultural lands to low density residential, as the slightly lower curve numbers provides <br />more infiltration and less runoff. <br />5.2.2 Clearwater Creek InfoSWMM - Proposed Conditions <br />The CWC model was updated to reflect the re-routing of ACD 55 mainline and Branch 8 into the CSMP <br />study area, contained in the URC model discussed above. The result is a minor decrease in flows through <br />the Clearwater Creek system for all design events (Table 5-5). <br />Table 5-5. Clearwater Creek Proposed Outflows <br />CWC NODE <br />2 -YR 24 -HR <br />10 -YR 24 -HR 100 -YR 24 -HR 100 -YR 10 -DAY <br />J3MT_001 <br />Revised Existing <br />217.3 <br />350.0 <br />566.0 <br />443.6 <br />Proposed <br />219.7 <br />349.0 <br />593.5 <br />439.1 <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 17 <br />