My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-06-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
11-06-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 12:27:44 PM
Creation date
12/7/2017 12:06:14 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/06/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Difference [cfs] <br />2.4 <br />-1.0 <br />27.5 <br />-4.5 <br />5.2.3 Hardwood Creek InfoSWMM - Proposed Conditions <br />The HWC model was updated to reflect the re-routing of ACD 72 into the CSMP study area, contained in <br />the URC model discussed above. The result is a negligible change in flows through the Hardwood Creek <br />system for all design events (Table 5-6). <br />Table 5-6. Hardwood Creek Proposed Outflows <br />HWC NODE <br />2 -YR 24 -HR <br />10 -YR 24 -HR 100 -YR 24 -HR <br />100 -YR 10 -DAY <br />JMT_001 <br />PELTIER LAKE <br />STAGE <br />Revised Existing <br />99.8 <br />214.3 <br />669.3 <br />903.2 <br />Proposed <br />101.5 <br />212.5 <br />669.3 <br />902.9 <br />Difference [cfs] <br />1.7 <br />-1.8 <br />0.02 <br />-0.3 <br />5.2.4 Rice Creek HEC -RAS - Proposed Conditions <br />The proposed conditions HEC -RAS was updated with the inflow hydrographs from the InfoSWMM models <br />and run to establish the proposed water surface elevations in Peltier Lake for the CSMP study (Table 5- <br />7). <br />Table 5-7. Peltier Lake Stage Summary [ft] <br />The detailed input and result tables from the proposed modeling is provided in Appendix D. <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 18 <br />2 -YR 24 -HR <br />10 -YR 24 -HR <br />100 -YR 24 -HR <br />100 -YR 10 -DAY <br />PELTIER LAKE <br />STAGE <br />Revised Existing <br />885.76 <br />886.41 <br />887.22 <br />887.51 <br />Proposed <br />885.73 <br />886.27 <br />886.98 <br />887.51 <br />Difference [ft] <br />-0.03 <br />-0.14 <br />-0.24 <br />0.00 <br />The detailed input and result tables from the proposed modeling is provided in Appendix D. <br />Comprehensive Stormwater Management Plan <br />Northeast Lino Lakes Drainage Improvement Project <br />WSB Project No. 2929-79 <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.