Laserfiche WebLink
6. The developer shall submit one draft Master Homeowner Associations (HOA) document <br />for the entire development. <br />7. The developer shall submit draft sub-HOA's with each PUD Final Plan/Final Plat phase <br />of development. <br />8. The developer shall submit recorded copies of the Master HOA document and applicable <br />sub -HOA documents prior to issuance of non -model building permits for each phase of <br />development. <br />9. Tree Preservation and Landscape, Buffer and Screen Standards <br />a. Detailed landscape berm plans and sections are required along CSAH 54. <br />b. Landscape screening and buffers shall be installed along CSAH 54, I -35E and in <br />between the townhomes and commercial. <br />c. Additional screening (e.g. landscaped berm, partial fence, hedge, etc) shall be <br />included along rear elevations of the townhome neighborhood along the trail to <br />screen personal items such as grills, lawn furniture etc. <br />d. Attention shall be made to the location of landscape plantings, buffer and berms <br />in regards to grading, storm sewer and utility location, catch basins, etc. <br />e. Water re -use pump stations shall be viewed to determine if screening is required. <br />10. Single Family Neighborhoods <br />a. Detailed house architectural plans, color renderings and material palette shall be <br />submitted with each PUD Final Plan/Final Plat for all single family lots <br />b. The developer shall provide a map highlighting the applicable single family lots <br />abutting CSAH54, Street A and the public park. <br />11. Townhome Neighborhood <br />a. A separate plan set detailing the townhome neighborhood shall be required. <br />b. Detailed architectural plans and color renderings shall be submitted for all <br />townhome building elevations with each PUD Final Plan/Final Plat. <br />12. Parks and Trails <br />a. Details on water fountains shall be required with PUD Final Plan/Final Plat. <br />b. A Trail Phasing Plan shall be required with PUD Final Plan/Final Plat. <br />c. A "trail corridor" shall be installed along one side of Street B in lieu of sidewalk <br />to make a connection to the park. The trail could be bituminous or concrete. <br />13. Wetlands and Buffers <br />a. The lots surrounding Outlot A shall be evaluated to verify proper wetland buffers <br />(10-25 feet) can be established outside of lots. <br />b. Wetland area calculations differ from Sheet 23 and Wetland Permit Application <br />and shall be adjusted accordingly. <br />c. Conservation easements for wetland buffers shall be recorded with the final plat. <br />14. Water Re -use <br />a. Irrigation system for public park, berm area and townhome open space shall <br />utilize stormwater re -use as recommended in the Watermark Water Re -Use <br />Feasibility Study. <br />