My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-24-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
07-24-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 1:04:06 PM
Creation date
3/14/2018 12:13:43 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/24/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> <br />Comment: <br /> <br />1. Fox Road shall be paved south to the east lot line of Lot1, Block 3. <br /> <br />Public Utilities <br /> <br />The submitted plans indicate water main and sanitary sewer extending the length of Fox Road <br />and servicing Lot 2, Block 3. <br /> <br />Comment: <br /> <br />1. The watermain shall be extended south to the east side of Lot 1, Block 3. <br />a. Future Lot 1 and Lot 2, Block 3 shall be served when the watermain is looped <br />through the Comcast development. <br />2. The sanitary sewer shall be extended south to serve Lot 5, Block 2. <br />a. Future Lot 1 and Lot 2, Block 3 shall be served by gravity sanitary sewer through <br />the Comcast development. <br />Easements <br /> <br />Standard drainage and utility easements are provided on all lot lines. <br /> <br />The Comcast property is also encumbered by a Right-of-Way, Drainage and Utility Easement <br />held by the City for the purposes of constructing street and utilities. This easement will be <br />vacated upon development. <br /> <br />Public Land Dedication and Fees <br /> <br />The City is requiring cash in lieu of land dedication. By requiring Lot 1 and Lot 2, Block 3 to be <br />platted as an outlot, eight (8) lots will be platted in the Third Addition. A credit in the amount of <br />$5,112 will be applied for developer costs incurred to extend additional boardwalk along Lot 5, <br />Block 4, Saddle Club 2nd Addition. <br /> <br />Saddle Club Third Addition <br />8 lots x $2,575 = $20,600 <br />Boardwalk Credit = ($5,112) <br />TOTAL = $15,488 <br /> <br />Trail <br /> <br />The trail was constructed from the Foxborough development to Black Berry Court in the Second <br />Addition. The last remaining 150 foot section to Fox Road will be constructed with the Third <br />Addition. <br />Outlot A as shown on the final plat is a small section of trail that was inadvertently constructed <br />on what was supposed to be Lot 1, Block 3.
The URL can be used to link to this page
Your browser does not support the video tag.