My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-14-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
08-14-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:03:05 PM
Creation date
3/14/2018 12:14:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/14/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lino Lakes – West Shadow Lake & LaMotte Street & Utility Improvement Projects – Proposal for Final Design <br />August 4, 2017 <br />Page 3 <br /> <br />K:\02988-450\Admin\Contract\Final Design - Proposal\2017-07-12 LL Shadow Lks & LaMotte - Proposal for Final Design - Final.docx <br /> It has been assumed that the City will provide record plan information or any <br />existing plat information for incorporation into the AutoCAD base-map and TIN. <br />Once the project is complete, WSB will provide the City with the electronic files <br />used on the project. Any additional survey requested by the City, or what may be <br />needed due to changes in scope, or schedule, will require a re-evaluation of this <br />service fee. <br /> <br />Well and septic system survey (Erin H): <br /> WSB will complete an investigation of each private well and septic system that is <br />located along West Shadow Lake Drive. The investigation will include the <br />following: review well logs and septic records, coordinate with residents, field <br />locate each well, and survey private properties with well and septic systems. This <br />task does not include coordination with the Minnesota Department of Health <br />(MDH) or preparing material for possible well variance requests. <br /> WSB will complete an investigation of each sanitary sewer connection and sump <br />pump in the LaMotte neighborhood. The investigation will include home and <br />basement inspection and working with residents to make sure sump pump <br />connections are up to code. <br /> <br /> Watermain and Sewer Sizing and Design (Erin H. & Ray T.) <br /> WSB will complete the sizing and design review of the watermain along West <br />Shadow Lake Drive and LaMotte area in accordance with Ten State Standards. <br />The sizing of the watermain will be completed with the use of the City’s existing <br />water system model, where the proposed West Shadow Lake Drive phase scenario <br />will be added to the model to appropriately size the proposed watermain <br />extension. The design review will include final plan review to ensure size and <br />layout of watermain meets MDH requirements. <br /> WSB will complete the sizing and design review the of the grinder pump stations <br />and low-pressure forcemain on West Shadow Lake Drive. The sizing of the <br />forcemain, and the analysis of the impact of the additional sewer flows to the <br />City’s collection system, will be evaluated using the City’s sewer model. This <br />task also includes design and review of the forcemain system, to ensure size and <br />layout of the sewer system meets State requirements. <br /> <br /> Wetland delineations and floodplain review (Alison H and Katy T): <br /> This task will involve a review of available desktop data (e.g., Anoka County <br />Soils, National Wetland Inventory, DNR Public Waters, local contours, etc.) and <br />available historic aerials. These data will be used to inform the wetland <br />delineation for both the West Shadow Lake and LaMotte project areas. <br /> Following review of desktop data, a wetland delineation will be completed within <br />the project areas. The wetland delineation will be completed in conformance with <br />the US Army Corps of Engineers Wetland Delineation Manual (US Army Corps <br />of Engineers, 1987) and the Northcentral/Northeast Regional Supplement. The <br />delineations will be marked in the field with fluorescent pink-colored pin flags. <br />All flag locations will be recorded using a sub-meter accuracy GPS unit. <br /> The information obtained during the desktop and field review will be compiled <br />into a wetland delineation report. The report will be written in accordance with <br />the 2015 Guidance for Submitting Delineation Reports in Minnesota. A draft of
The URL can be used to link to this page
Your browser does not support the video tag.