My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-14-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
08-14-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:03:05 PM
Creation date
3/14/2018 12:14:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/14/2017
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6B <br /> <br /> <br />STAFF ORIGINATOR: Michael Grochala <br /> <br />MEETING DATE: August 14, 2017 <br /> <br />TOPIC: Consider Resolution No. 17-83, Authorizing <br />Preparation of Plans and Specifications, 2018 Street <br />Reconstruction Project (West Shadow Lake & <br />LaMotte Areas) <br /> <br />VOTE REQUIRED: Simple Majority <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting council authorization to prepare plans and specifications for the 2018 Street <br />Reconstruction Project. The proposed improvements consist of street, storm sewer, and sanitary <br />sewer and potential water main improvements. <br /> <br />BACKGROUND <br /> <br />On June 12, 2017 the City Council held a public hearing and took action to adopt Resolution No. <br />17-54 approving the 5 Year Street Reconstruction Plan (2017 – 2021) and provide preliminary <br />authorization for the issuance of $5,124,000 in General Obligation Bonds. The plan includes the <br />proposed reconstruction of the West Shadow Lake and LaMotte areas in 2018. 4th Avenue <br />(north of Main), Diane Street, 81 St., Elbe St. and Danube St (North Area Improvements) are <br />proposed for reconstruction in 2021. <br /> <br />The plan was subject to a reverse referendum process which allows city residents to submit a <br />petition to request an election on the plan. The petitioning period closed on July 12, 2017 and no <br />petition was received. As a result the council may consider moving forward with the proposed <br />2018 improvements. <br /> <br />There are certain procedural steps that the City Council will take action on during a public <br />improvement process. The steps include, but are not limited to, the following: <br /> <br />1. Council Authorizes Preparation of Plans and Specifications. This is the action being <br />taken Monday night. This approves the contract with WSB to perform the work necessary <br />to design and deliver a project for bidding. <br /> <br />2. Council Authorizes initiation of easement/land acquisition, if necessary. The need for <br />easements and/or land acquisitions will be dependent on design considerations and <br />construction limits developed through the process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.