My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-02-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
10-02-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 2:23:41 PM
Creation date
3/14/2018 12:14:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/02/2017
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CENTERVILLE RD (CSAH 21/CSAH 59) AT ASH ST (CR J)/WILKINSON LAKE BLVD PAGE 18 <br />ICE REPORT <br />S.A.P. TBD <br />WSB PROJECT NO. 2988-080 <br />CITY OF LINO LAKES, MN <br /> <br /> <br />2038 No-Build Conditions: The analysis of the 2038 no-build conditions with existing lane <br />geometrics and all-way stop control show the intersection of Centerville Road (CSAH 21/CSAH <br />59) at Ash Street (CR J) would be operating at an overall LOS F in the AM and PM peak hours. <br />Specifically the southbound approach, northbound left/through movement and the westbound <br />right turn movements are showing unsatisfactory levels of service. In addition the southbound <br />approach at the intersection of Ash Street (CR J) at 20th Avenue/I35E Ramp would also be <br />operating an LOS F during the AM and PM hours. The results of the 2038 no-build condition <br />traffic operations analysis are summarized in Table 7. Detailed modeling results are provided in <br />Appendix D. <br /> <br />Table 7: 2038 No Build Condition Operations Summary <br />Intersection AM Peak PM Peak Control Location Appr <br />Movement Delay (LOS) <br />Intersection <br />Delay(LOS) <br />Movement Delay (LOS) Intersectio <br />n <br />Delay/LOS Left Through Right Left Through Right Stop Centerville Rd <br />(CSAH 21/CSAH 59) <br />at Ash St (CR J) <br />NB 16.3 (C) 10.9 (A) <br />222.6 (F) <br />57.2 (F) 19.7 (C) <br />173.0 (F) WB 26.3 (D) 23.4 (C) 13.7 (B) 176.7 (F) <br />SB 411.8 (F) 312.3 (F) <br />EB 14.0 (B) 17.9 (B) Stop Ash St at 20th <br />Ave/I35E Ramp <br />WB 10.6 (B) <br />7.6 (A) <br />9.9 (A) <br />5.0 (A) SB 53.9 (F) 95.7 (F) <br />EB 9.0 (A) 11.0 (B) <br /> <br />2018 Build Conditions: The 2018 build conditions assume that the proposed Hawkins <br />residential project is fully developed. Similar to the 2018 no-build condition analysis the 2018 <br />build conditions with existing lane geometrics and all-way stop control show the intersection <br />would be operating at an overall LOS F in the AM and PM peak hours. Specifically the <br />southbound approach and the westbound right turn movements are showing unsatisfactory levels <br />of service. The results of the 2018 build condition traffic operations analysis are summarized in <br />Table 8. Detailed modeling results are provided in Appendix D. <br /> <br />Table 8: 2018 Build Condition Operations Summary <br />Intersection AM Peak PM Peak Control Location Appr <br />Movement Delay (LOS) <br />Intersection <br />Delay(LOS) <br />Movement Delay (LOS) Intersectio <br />n <br />Delay/LOS Left Through Right Left Through Right Stop Centerville Rd <br />(CSAH 21/CSAH 59) <br />at Ash St (CR J) <br />NB 12.9 (B) 9.7 (A) <br />87.1(F) <br />24.2 (C) 13.7 (B) <br />52.7 (F) WB 17.2 (C) 15.0 (B) 12.3 (B) 47.9 (E) <br />SB 157.0 (F) 109.6 (F) <br />EB 12.1 (B) 14.3 (B) Stop Ash St at 20th <br />Ave/I35E Ramp <br />WB 8.7 (A) <br />3.4 (A) <br />8.9 (A) <br />3.3 (A) SB 16.1 (C) 21.3 (C) <br />EB 8.4 (A) 9.5 (A) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.