Laserfiche WebLink
11 <br /> <br />Three unique building facades are proposed with the Jefferson/Madison, Adams/Monroe and <br />Franklin/Revere products. This requirement is met. <br /> <br />b. A table of architectural façade data shall be included for each elevation. <br /> <br />A table has been provided. <br /> <br />c. A unique building color package shall be included for each phase of <br />development. <br /> <br />Unique building color packages were included with this submittal and will also be required <br />with each phase of development. <br /> <br />d. At no point will the same façade and same color package be specified on <br />buildings that are immediately adjacent to or directly across the road from each <br />other. <br /> <br />Adjacent building color packages and facades will be reviewed with each phase of development <br />to ensure compliance. <br /> <br />e. A minimum of 4 inch window trim on side and/or rear elevations to match the <br />dimensions of the front elevation. <br /> <br />Lennar proposes 6 and 10 inch window trim on all elevations. This requirement is met. <br /> <br />f. In no case shall any exterior material be less than 10%. <br /> <br />To clarify any confusion, in no case shall any exterior material or style per elevation be less <br />than 10%. For example, per the façade data chart provided by Lennar, on the rear and side <br />facades, board and batten, shakes and shutters and brick/stone are less than 10%. These shall <br />be revised. <br /> <br />Any additional exterior materials and/or styles included on an elevation that exceeds the <br />minimum requirement do not need to meet the 10% requirement. For example, rear elevations <br />require a combination of 2 exterior materials and/or styles. If a 3rd material or style is <br />incorporated, it does not need to be 10%. <br /> <br />g. Front elevations shall have a combination of 3 exterior materials and/or styles as <br />defined above. <br /> <br />The front elevations have a combination of 3 exterior materials and/or styles; however, one of <br />the exterior materials is vinyl siding with engineered trim products. Lennar is requesting vinyl <br />siding be allowed. <br /> <br />h. At least 60% (e.g. two of the three buildings) of the facades in each phase shall <br />include brick, stone or stucco on the front elevation. <br />