Laserfiche WebLink
2 <br /> <br />• Century Farm North PUD/Preliminary Plat Amendment 7th Addition Civil Plan Set <br />prepared by Plowe Engineering, Inc. dated August 18, 2017 <br />• Preliminary Plat, Certificate of Survey/Resource Inventory prepared by E.G. Rud & <br />Sons, Inc. dated August 18, 2017 <br />• Original Approved Preliminary Plat dated August 3, 2017 <br />• Final Plat prepared by E.G. Rud & Sons, Inc. <br /> <br />BACKGROUND <br /> <br />Lot Summary <br /> <br />The Lot Summary reflects changes from the approved original PUD Development Stage <br />Plan/Preliminary Plat, final plats and four (4) amendments. <br /> <br />Phase Single Family <br />Lots Air Park <br />Single Family <br />Detached <br />Townhomes <br />Attached <br />Townhomes TOTAL <br /> Original Proposed Original Proposed Original Proposed Original Proposed Original Proposed <br />1st 30 26 9 8 16 16 0 0 55 50 <br />2nd 1 0 0 0 22 23 42 42 65 65 <br />3rd 0 0 9 14 9 9 34 34 52 57 <br />4th 0 0 0 0 1 1 38 38 39 39 <br />5th 5 0 0 0 0 5 0 0 5 5 <br />6th 11 29 0 0 10 0 0 0 21 29 <br />7th 0 4 0 0 0 0 12 0 12 4 <br />TOTAL 47 59 18 22 58 54 126 114 249 249 <br />Difference 12 4 -4 -12 0 <br /> <br />Zoning and Land Use <br /> <br />Current Zoning PUD, Planned Unit Development <br />Current Land Use Vacant Residential <br />Future Land Use per CP Medium Density <br />(4.0 to 5.9 units per acre) <br />Utility Staging Area 1A = 2008-2015 <br />Topography and <br />MLCCS <br />Flat with sod on hydric soils and saturated <br />altered/non-native vegetation <br /> <br /> <br />