Laserfiche WebLink
WSB <br />- Engineering • Planning ■ Environmental • Construction <br />& Associates, Inc. <br />February 8, 2018 <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Engineering Proposal for the 2018 Mill and Overlay Project <br />Dear Mr. Grochala: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />The City of Lino Lakes has a Pavement Management Plan which recommends preservation of <br />local roadways based on their OCI ratings. The proposed 2018 Mill and Overlay Project <br />(roadway preservation) includes: <br />Mill and Overlay <br />• Ware Road (6365 LF) Total Estimated Cost - $415,000 <br />Project scope to include minor curb and gutter replacement and <br />storm sewer repair <br />• Brandywood Estates (4610 LF) Total Estimated Cost - $300,000 <br />Whitetail Trail, White Oak Road, Buckthorn Lane, <br />Chokecherry Road, Velvetleaf lane <br />Project scope to include minor curb and gutter replacement and <br />storm sewer repair <br />Based on the City's existing street maintenance plan and discussions with staff, WSB would <br />perform the following tasks: <br />I. Prepare Final Project Plans/Maps <br />Final construction plans will be prepared for the milling and overlaying of the <br />above listed roadways. Topographic information will be collected by a <br />combination of field survey, city parcel map information and Lidar contours. <br />Construction plans necessary for the contractor to build the roadway to <br />specifications will be prepared. <br />RCWD, Ramsey County and Anoka County permits will be obtained for the <br />project. <br />Minneapolis • St. Cloud <br />Equal Opportunity Employer <br />