My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/03/2018 EDAC Packet
LinoLakes
>
Advisory Boards & Commissions
>
Economic Development Advisory Committee
>
Packets
>
2018
>
05/03/2018 EDAC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 11:59:50 AM
Creation date
4/25/2018 3:45:45 PM
Metadata
Fields
Template:
EDAC
EDAC Document Type
EDAC Packet
Meeting Date
05/03/2018
EDAC Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Project Updates <br />Mr. Grochala updated the board on three proposed commercial projects currently going <br />through the approval process including Distinctive Elements contractor office, Love to <br />Grow On day care and the Main Street Shoppes project. <br />Mr. Johnson asked about the West Shadow Lakes Drive reconstruction. Mr. Grochala <br />stated that a lakeshore owners meeting was being held to discuss the outlet elevation of <br />Reshanau Lake. He stated the project includes raising the road elevation and replacement <br />of the outlet culvert. This has the potential to impact lake elevations. Staff is working <br />with DNR, RCWD, and the Army Corps of Engineers on the design permitting process. <br />Mr. Schwartz asked how the project was being funded. Mr. Grochala stated that the <br />street and storm sewer portion was being paid for through property taxes. The sewer and <br />water extensions are being assessed against benefitting properties. <br />ADJOURNMENT <br />The meeting was adjourned at 9:01 A.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.