Laserfiche WebLink
The proposed development shows two new accesses on Hodgson Road and a future <br />access on County Road J as anticipated in the Master Plan. The project includes a loop <br />road that creates a public street connection from the northern access to County Road J <br />when the adjacent land develops. Staff recommends that this internal loop road be a 32- <br />foot wide street. The typical City right-of-way in the City is 60 feet. If the developer <br />wishes to provide a reduced right-of-way, they will need to show that sidewalks can be <br />incorporated. Roads will also need to be wider at the approach to Hodgson to allow for <br />left and right thru-turn lanes. The street serving the townhomes could be allowed as a 26- <br />foot wide private drive. The plans should be revised to ensure that these internal <br />streets/drives meet at 90 degrees for public safety and sight visibility. <br />Parking is permitted on one side of the public street, but is not permitted on the private <br />drive within the townhome area. The applicant must ensure a minimum of 22 feet <br />between the townhome garage and the adjacent sidewalk to ensure adequate vehicle <br />space in the driveway without spilling into the street or sidewalk areas. Generally, the <br />City requires a 6-foot boulevard between the street and the sidewalk to ensure adequate <br />space for vegetation to grow. Staff will work with the applicant on the final design. <br />The plans also provide additional right-of-way for Hodgson Road improvements. The <br />Comprehensive Plan identifies the Hodgson/County Road J intersection as a congested <br />area of concern with the existing traffic volumes. The applicant will need to complete a <br />traffic study prior to submittal of a preliminary plat. <br />Anoka County is analyzing the corridor to determine the final alignment. The applicant <br />should work with the City and County to ensure that right-of-way dedication for Hodgson <br />is consistent with County plans. <br />The concept plan is generally consistent with the plan for this area, but the applicant must <br />work with the City to finalize the design. The City Engineer's memo is attached and it <br />notes several items that must be addressed if this project proceeds. <br />Parks, Trails and Open Space <br />The Draft 2040 Comprehensive Plan shows the continuation of the off -road trail <br />constructed on the property to the west being extended through the site to Hodgson Road <br />where it will connect to an on -road trail that will be constructed with this project. The <br />Master Plan redevelopment requirements note that an "enhancement corridor" is <br />identified on the site in the Parks, Natural Open Space / Greenways and Trail system <br />plan. The plan also notes that there should be a focal point greenspace where the trail <br />enters the site. The concept plan provided does not show a trail connection from this <br />location. <br />The plans do show a trail along Hodgson Road, consistent with the Master Plan and <br />Comprehensive Plan, and sidewalks within the project. A private amenity space for <br />development residents, including a club house with recreation space is also provided. <br />71 <br />