Laserfiche WebLink
Ms. Katie Larsen <br />June 29, 2018 <br />Page 3 <br />J. Turning lanes are proposed be added to access the development from Hodgson Road. <br />Interior drives and parking areas are proposed. <br />The intersection of Hodgson Road (CSAH 49) and Ash Street/County Road J (CSAH 32) <br />has been identified in the City's Comprehensive Transportation Plan as a congested area of <br />concern with the existing traffic volumes. <br />Comments: <br />1. A Traffic Impact Study shall be prepared to provide an analysis of the existing LOS with <br />and without the proposed development as outlined in the City's Zoning Code. <br />2. The intersections that should be analyzed are: <br />• Hodgson Road (CSAH 49) at the proposed site entrance <br />• Hodgson Road (CSAH 49) at Ash Street/CR J (CSAH 32) <br />• Ash Street/CR J (CSAH 32) at proposed site entrance <br />• Ash Street/CR J (CSAH 32) at St Albans Street <br />3. The Traffic Study and proposed site accesses shall be reviewed and approved by Anoka <br />County. The proposed south access off Hodgson Road has been determined by Anoka <br />County to be a right-in/right-out access. This intersection shall be included in the Traffic <br />Study to determine the impact it will have on the adjacent intersections. <br />4. Future connection to County Road J will require participation and agreements with <br />property owners to the south. Said agreements must be in place and recorded as part of <br />the developer's agreement. Location and alignment of the southerly road extension must <br />be consistent with the Master Planning Study of Hodgson Road and CR J, approved by <br />Lino Lakes City Council on February 12, 2007. <br />5. The development shows the dedication of additional right of way along CSAH 49. This <br />right of way will need to be adjusted based on Hodgson Road future improvement <br />layouts. Review and approval by the Anoka County Highway Department will be <br />required. <br />6. There shall be a 32 foot wide internal public road that connects the north Hodgson access <br />to the south at CR J. <br />7. Private roadways shall be 26 foot wide. <br />8. A multi -use bituminous trail along CSAH 49 will be required from the north line of the <br />development to County Road J. <br />9. The north Hodgson Road access will be a future signalized intersection and the internal <br />roadway intersection shall be set back to accommodate. Aligned intersections is <br />preferred. <br />10. Internal road intersections shall be 90 degrees for a minimum of 100 feet to accommodate <br />turning for emergency services and site distances. <br />• Environmental <br />Based on the housing threshold, an Environmental Assessment Worksheet is not required. <br />• Floodplain <br />No Floodplain is present on the proposed Lyngblomsten development. <br />S:\Community D—lopment\Pr jectsWlanning Cases\Lyngblomsten\Staff Reports\20180714 PZ Lyngblomsten CP\a4, 20180628 Engineering CPR-Lyngblomst <br />