Laserfiche WebLink
Ms. Katie Larsen <br />June 29, 2018 <br />Page 4 <br />• Wetlands and Mitigation Plan <br />There is a wetland in the northwest corner of the Lyngblomsten development site. <br />Comments: <br />1. A current and certified wetland delineation report will be required at the time of <br />Preliminary Plat submittal. <br />2. If wetlands will be impacted due to development of the project, a mitigation plan will be <br />required at the time of Preliminary Plat submittal. <br />• Drainage and Utility Easements <br />The Lyngblomsten development appears to have internal drainage basins that would receive <br />stormwater from the proposed public streets. <br />Comments: <br />1. The city will require drainage and utility easements over storm sewer systems that <br />convey drainage from public right of way (including ponds and detention basins). <br />2. The city will require drainage and utility easements over sanitary sewer and water <br />systems. <br />• Development Agreement <br />The Lyngblomsten development will require a Development Agreement. <br />• Stormwater Maintenance Agreement <br />The Lyngblomsten development will require a Stormwater Maintenance Agreement with the <br />City of Lino Lakes. <br />• Permits Required <br />Permits from governing agencies will be required and determined through the preliminary <br />plat process. <br />If you or the applicant has any questions regarding these comments, please contact Diane <br />Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. <br />S:\Community D—lopment\Pr jectsWlanning Cases\Lyngblomsten\Staff Reports\20180714 PZ Lyngblomsten CP\a4, 20180628 Engineering CPR-Lyngblomst <br />