My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-14-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
01-14-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 8:52:38 AM
Creation date
2/28/2019 11:23:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/14/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Water Supply Plan Template —December 8, 2015 <br />Part 4. ITEMS FOR METROPOLITAN AREA COMMUNITIES <br />METROPOLITAN <br />OOUNCIL <br />Minnesota Statute 473.859 requires WSPs to be completed for all local units of government in the <br />seven -county Metropolitan Area as part of the local comprehensive planning process. <br />Much of the information in Parts 1-3 addresses water demand for the next 10 years. However, <br />additional information is needed to address water demand through 2040, which will make the WSP <br />consistent with the Metropolitan Land Use Planning Act, upon which the local comprehensive plans are <br />based. <br />This Part 4 provides guidance to complete the WSP in a way that addresses plans for water supply <br />through 2040. <br />A. Water Demand Projections through 2040 <br />Complete Table 7 in Part 1D by filling in information about long-term water demand projections through <br />2040. Total Community Population projections should be consistent with the community's system <br />statement, which can be found on the Metropolitan Council's website and which was sent to the <br />community in September 2015. <br />Projected Average Day, Maximum Day, and Annual Water Demands may either be calculated using the <br />method outlined in Appendix 2 of the 2015 Master Water Supply Plan or by a method developed by the <br />individual water supplier. <br />B. Potential Water Supply Issues <br />Complete Table 10 in Part 1E by providing information about the potential water supply issues in your <br />community, including those that might occur due to 2040 projected water use. <br />The Master Water Supply Plan provides information about potential issues for your community in <br />Appendix 1 (Water Supply Profiles). This resource may be useful in completing Table 10. <br />You may document results of local work done to evaluate impact of planned uses by attaching a <br />feasibility assessment or providing a citation and link to where the plan is available electronically. <br />C. Proposed Alternative Approaches to Meet Extended Water Demand <br />Projections <br />Complete Table 12 in Part 1F with information about potential water supply infrastructure impacts (such <br />as replacements, expansions or additions to wells/intakes, water storage and treatment capacity, <br />distribution systems, and emergency interconnections) of extended plans for development and <br />redevelopment, in 10-year increments through 2040. It may be useful to refer to information in the <br />community's local Land Use Plan, if available. <br />Complete Table 14 in Part 1F by checking each approach your community is considering to meet future <br />demand. For each approach your community is considering, provide information about the amount of <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.