My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-14-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
01-14-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 8:52:38 AM
Creation date
2/28/2019 11:23:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/14/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Water Supply Plan Template —December 8, 2015 <br />future water demand to be met using that approach, the timeframe to implement the approach, <br />potential partners, and current understanding of the key benefits and challenges of the approach. <br />As challenges are being discussed, consider the need for: evaluation of geologic conditions (mapping, <br />aquifer tests, modeling), identification of areas where domestic wells could be impacted, measurement <br />and analysis of water levels & pumping rates, triggers & associated actions to protect water levels, etc. <br />D. Value -Added Water Supply Planning Efforts (Optional) <br />The following information is not required to be completed as part of the local water supply plan, but <br />completing this can help strengthen source water protection throughout the region and help <br />Metropolitan Council and partners in the region to better support local efforts. <br />Source Water Protection Strategies <br />Does a Drinking Water Supply Management Area for a neighboring public water supplier overlap your <br />community? 0 Yes ❑ No <br />If you answered no, skip this section. If you answered yes, please complete Table 32 with information <br />about new water demand or land use planning -related local controls that are being considered to <br />provide additional protection in this area. <br />Table 32. Local controls and schedule to protect Drinking Water Supply Management Areas <br />Local Control <br />Schedule to <br />Implement <br />Potential Partners <br />❑ None at this time <br />❑ Comprehensive planning that guides development in <br />vulnerable drinking water supply management areas <br />M Zoning overlay <br />Currently <br />implemented. <br />Anoka County has a <br />wellhead protection <br />consortium that works <br />together for Wellhead <br />Protection Plan <br />implementation. <br />■ Other: <br />Technical assistance <br />From your community's perspective, what are the most important topics for the Metropolitan Council to <br />address, guided by the region's Metropolitan Area Water Supply Advisory Committee and Technical <br />Advisory Committee, as part of its ongoing water supply planning role? <br />O Coordination of state, regional and local water supply planning roles <br />❑ Regional water use goals <br />O Water use reporting standards <br />❑ Regional and sub -regional partnership opportunities <br />❑ Identifying and prioritizing data gaps and input for regional and sub -regional analyses <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.