<br />CITY COUNCIL <br />AGENDA ITEM 6D i & ii <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br /> <br />MEETING DATE: September 24, 2018 <br /> <br />TOPIC: 2018 Trunk Watermain and Trail Project <br /> <br />i) Consider Resolution No. 18-122, Accepting bids, <br />Awarding a Construction Contract <br /> <br />ii) Consider Resolution No. 18-123 Approving <br />Construction Services Contract with WSB and <br />Associates <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting council authorization to accept bids, award construction contract, and <br />approving construction services contract with WSB and Associates for the 2018 Trunk <br />Watermain and Trail Project. <br /> <br />BACKGROUND <br /> <br />On February 26, 2018 the City Council approved the preparation of the plans and specifications <br />for the 2018 Trunk Watermain and Trail project. The project provides improved quality water <br />supply and adequate pressure for fire demand. The project also completes the trail connection <br />from Marshan Lane to Park Court. The Trunk Watermain and Trail project includes the <br />following improvements: <br /> <br />1. The installation of approximately 1,100 feet of 12-inch diameter trunk watermain from <br />Marshan Lane to Park Court. <br />2. The installation of approximately 330 feet of 12-inch diameter trunk watermain, from an <br />existing line (from Well No. 6) to Well No. 3. <br />3. A 8.5 foot wide bituminous trail along the Lake Drive watermain corridor from <br />Marshan Lane to Park Court. <br /> <br />The budget for the project is $465,000. Funding for the project is provided from trunk utility <br />area & unit fund, and the parks & trail fund. <br /> <br /> <br />CONTRACTOR TOTAL BID <br />Dresel Contracting Inc. $247,868.09 <br />Northdale Construction Company Inc. $292,166.00