My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-24-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
09-24-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:14:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/24/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ryan Contracting Co. $298,332.00 <br />A-1 Excavating Inc. $323,114.00 <br />RL Larson Excavating Inc. $345,896.51 <br />Rachel Contracting $354,341.25 <br />Forest Lake Contracting Inc. $422,058.96 <br /> <br /> <br />The low bid was submitted by Dresel Contracting, Inc. in the amount of $247,868.09. The <br />engineers estimate for the project was $300,272.50. <br /> <br />WSB and Associates has submitted a proposal to complete the construction services for the <br />2018 Trunk Watermain and Trail Project in the amount of $20,539.00 and materials testing in <br />the amount of $2,959.00. <br /> <br />The estimated total project cost is $271,366.09 which includes, construction, engineering and <br />administrative costs associated with the project. The final completion date for this project is <br />November 30, 2018. <br /> <br />RECOMMENDATION <br /> <br />Staff recommends adoption of Resolution No. 18-122, Accepting the Bid and Awarding a <br />Construction Contract in the amount of $247,868.09 to Dresel Contracting, Inc., and adoption of <br />Resolution No. 18-123, Approving the Construction Services Contract with WSB and Associates <br />in the amount of $23,498.00, for the 2018 Trunk Watermain and Trail Project. <br /> <br />ATTACHMENTS <br /> <br />1. Resolutions <br />2. Bid Tabulation <br />3. WSB Proposal
The URL can be used to link to this page
Your browser does not support the video tag.