My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-22-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
10-22-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:19:04 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/22/2018
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Project Manager Process Engineer Process City Civil Civil Two Man Survey Administrative <br />Engineer Engineer Engineer Engineer Survey Crew Technician Technician Total <br />WORK TASK Technician Technician Hours Cost <br />Task Description <br />A PRELIMINARY DESIGN SERVICES <br />Meetings 9 9 6 3 3 3 1 34 $4,824.00 <br />Initial site surveying and staking 0.5 1 9 4 14.5 $2,429.00 <br />Review soil borings and geotechnical report 1 1 2 $287.00 <br />Prepare preliminary drawings and construction cost estimate for City’s review 24 24 60 8 12 12 2 142 $20,160.00 <br />Electrical engineering subconsultant $3,750.00 <br />SUBTOTAL PRELIMINARY DESIGN SERVICES $31,450.00 <br />B FINAL DESIGN SERVICES <br />Prepare detailed design drawings and specifications for the final design and bidding 84 121 124 4 16 16 10 375 $51,557.00 <br />Organize and conduct progress meetings with design team and City staff at 90 <br />percent completion of the design 6 6 6 3 3 3 1 28 $3,963.00 <br />Prepare final construction cost estimate prior to bidding 2 4 3 0.5 9.5 $1,348.00 <br />Electrical engineering subconsultant $5,100.00 <br />SUBTOTAL FINAL DESIGN SERVICES $61,968.00 <br />C BIDDING SERVICES <br />Distribute bidding documents to prospective bidders 6 6 $540.00 <br />Advertise project for bids 0.5 1 1 2 4.5 $532.00 <br />Answer questions from contractors during bidding and issue addenda as necessary 6 6 1 2 4 19 $2,584.00 <br />Attend the bid opening and evaluate the bids 1 2 1 4 $548.00 <br />Provide a recommendation to the City regarding award of the construction contract 0.5 1 1 2 4.5 $532.00 <br />Electrical engineering subconsultant $750.00 <br />SUBTOTAL BIDDING SERVICES $5,486.00 <br />Total Hours 134.5 176 196 22 39 34 9 4 28.5 643 $98,904.00 <br />2018 Hourly Rates 182.00 105.00 142.00 156.00 173.00 104.00 185.00 142.00 90.00 <br />WSB SALARY COSTS $24,479.00 $18,480.00 $27,832.00 $3,432.00 $6,747.00 $3,536.00 $1,665.00 $568.00 $2,565.00 $98,904.00 <br />Lino Lakes, Minnesota <br />Water Tower No. 3 Project - Design and Bidding Services <br />ESTIMATE OF COST <br /> W SB & Associates I nc.
The URL can be used to link to this page
Your browser does not support the video tag.