My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-26-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
11-26-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:26:18 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/26/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />{00149157 12} 19. <br />A credit to Developer will be allowed by the City for oversizing and overdepth of <br />sanitary sewer system to serve other properties as reasonably determined by the <br />City Engineer in consultation with Developer’s engineer. <br />The specific amounts due for trunk and availability charges for each phase of the <br />Development will be confirmed in the subdivision agreement for such phase. <br /> <br />10.2 Trunk Water Connection Fees <br />The City has established trunk water connection fees to uniformly distribute the <br />costs of public trunk water infrastructure. The Trunk Water Connection Fee <br />consists of two components; a Trunk Charge and an Availability Charge. <br />Trunk Charge <br /> <br />The trunk charge for a particular phase shall be paid at the time of subdivision <br />approval of the phase. The present Water Trunk Charge is $2,162 per unit, but the <br />Developer acknowledges the City adjusts the charge annually, and Developer is <br />responsible for payment of the per unit fee in place at the time of approval of a <br />particular phase. <br /> <br />Availability Charge <br /> <br />The availability charge for a particular phase shall be paid at the time of <br />subdivision approval of that phase. The present Availability Charge is $1,360.00 <br />per unit, but the Developer acknowledges the City adjusts the charge annually, <br />and Developer is responsible for payment of the per unit fee in place at the time of <br />approval of a particular phase. <br />A credit to Developer will be allowed by the City for upsizing of water main to <br />serve other properties as reasonably determined by the City Engineer in <br />consultation with Developer’s engineer. <br />The specific amounts due for trunk and availability charges for each phase will be <br />confirmed in the subdivision agreement for such phase. <br /> <br /> 10.3 Surface Water Management Fee <br /> <br /> The City has established a fee to uniformly distribute the costs of public trunk <br />surface water infrastructure and water quality improvements. The Surface Water <br />Management Fee is based on developable acreage, which, for the entire Development, is <br />determined to be 302.99 acres, calculated as follows: <br /> <br /> <br />Acres Square Feet <br />Gross Acres 372.24 16,214,774.40 <br />Wetlands1 (23.08) (1,005,365) <br />Public Open Space2 (13.24) (576,734)
The URL can be used to link to this page
Your browser does not support the video tag.