My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-10-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
12-10-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:32:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/10/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />{00149157 12} 13. <br />6.6 Landscaping <br /> <br />Final landscaping plans shall be submitted with the final plat for each phase of the <br />Development. They will be consistent with the Plans and will include species, location, size, and <br />type of tree to be planted in such phase. The Developer shall install street trees, as shown on the <br />Plans, which shall be located in accordance with approved PUD Landscape Plan. A letter of credit <br />or cash escrow in an amount to cover the City’s financial risk for the phase being developed, <br />separate from the Financial Guarantee for street and utility work within that phase, will be <br />submitted regarding the landscaping work, subject to the reasonable approval of the City engineer. <br />The letter of credit or cash escrow shall be reduced as Developer completes the required <br />landscaping within such phase as may be permitted by Section 6.9(d) hereof. <br /> <br />6.7 Street Lighting and Signs <br /> <br />For each phase of development, Developer shall submit a street lighting plan (as drafted <br />by Connexus and approved by the City). Developer shall establish an escrow with the City for <br />street light installation and the payment of 15 months of street light maintenance and energy costs <br />at the current rate as determined by the utility provider. A street sign plan will be provided by <br />Developer with the final plat of each phase of the Development. Street signs, for both public and <br />private streets, shall be designed in accordance with City Standard Specifications. Traffic control <br />and street signs shall be paid for by the Developer but installed by the City. Developer shall <br />establish a cash escrow with the City for acquisition and installation of signs, which shall be used <br />as street light work is done. <br /> <br />6.8 Surface Water Reuse – Irrigation System <br /> <br />a. Developer shall design and, install at its own expense an irrigation system for the <br />townhome area and the I-35E berm that utilizes the surface water as the primary source for <br />the irrigation water. Said system shall be operated and maintained by the Development’s <br />homeowners association. <br />b. The City shall irrigate the Public Park utilizing the surface water as the primary source for <br />the irrigation water. The City shall design and install its own irrigation system in all Public <br />Parks. <br /> <br />6.9 Security for Completion of Work in Plans and Subdivision Improvements <br /> <br />a. The Developer shall fully and faithfully comply with the terms of this Agreement and <br />phase-specific Development Agreements. The Developer will furnish to the City a cash <br />deposit, certified check, or Irrevocable Letter of Credit, based on one hundred fifty (150%) <br />percent of the total estimated cost of Developer's obligations under this Agreement, on a <br />phase by phase basis as determined by the City. For the phase of Development that will <br />include the Public Park and Outlot E, the Security shall include (but not be limited to) <br />security for the cost of grading the Public Park and the lake, identified as Outlot E, in the <br />approved Preliminary Plat to assure that it may be integrated into the City’s stormwater <br />system and linked to the storm water outlet from Peltier Lake to the western boundary of the <br />property as described in Section 5.1 hereof.
The URL can be used to link to this page
Your browser does not support the video tag.