My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-10-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
12-10-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:32:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/10/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />{00149157 12} 12. <br />and temporary easements for construction of the improvements contemplated in this <br />Agreement. <br /> <br /> <br />Article VI Subdivision Improvements <br /> <br />6.1 Adherence to Plans <br /> <br />Public and private improvements will be required for each phase of the Development, <br />subject to the City’s approval of the applicable subdivision agreement that incorporates the <br />approved plans and specifications for such phase. <br /> <br />6.2 Streets <br /> <br />All streets within the Development shall be constructed according to the Plans and the <br />requirements listed herein. The final wear course of all streets shall be completed upon <br />construction of 80% of the residential units within each phase or no later than two years after <br />completion of the base course, and a one-year warranty bond shall be provided prior to acceptance <br />of streets by the City to ensure the quality of the construction. A seal-coat fee shall be paid by <br />Developer upon approval of each phase for all public streets within that phase of the Development <br />in the amount specified in the City’s fee ordinance. The sealcoat fee is adjusted annually. <br /> <br />6.3 Sanitary Sewer <br /> <br />All sanitary sewer shall be installed within the Development according to the Plans, and <br />the requirements listed herein. A two-year warranty bond shall be provided prior to acceptance of <br />the sanitary sewer improvements by the City to ensure the quality of construction. A drainage <br />and utility easement shall be provided to the City and dedicated on the plat, consistent with City <br />requirements, along 20th Avenue North up to Watermark Way as identified in the approved <br />Preliminary Plat. <br /> <br />6.4 Watermain <br /> <br />Watermain shall be installed within the Development according to the Plans and the <br />requirements listed herein. A two-year warranty bond shall be provided prior to acceptance of <br />watermain improvements by the City to ensure the quality of construction. A drainage and utility <br />easement within the right-of-way for Watermark Way and Crane Drive as identified in the <br />approved Preliminary Plat shall be provided to the City and dedicated on the plat, consistent with <br />City requirements. <br /> <br />6.5 Surface Water Management <br /> <br />Storm sewers, including all necessary laterals, catch basins, inlets and other <br />appurtenances, shall be furnished and installed within the Development according to the Plans, <br />and the requirements listed herein. A two-year warranty bond shall be provided prior to <br />acceptance of storm sewer improvements by the City to ensure the quality of construction.
The URL can be used to link to this page
Your browser does not support the video tag.