My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-10-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
12-10-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:32:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/10/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />{00149157 12} 18. <br />10.1 Trunk Sewer Connection Fees <br /> <br />The City has established trunk utility connection fees to uniformly distribute the costs of <br />public trunk sanitary sewer infrastructure. The Trunk Sewer Connection Fee consists of two <br />components; a Trunk Charge and an Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge for a particular phase shall be paid at the time of subdivision approval of <br />that phase. The present trunk sewer charge is $1,505.00 per unit, but Developer acknowledges the <br />City adjusts the charge annually, and Developer is responsible for payment of per unit fee in place <br />at the time of approval of a particular phase. <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time of subdivision <br />approval of a particular phase. Fees are based on the number of sanitary access charge (SAC) <br />units assigned by Metropolitan Council Environmental Services (MCES). Residential uses shall <br />be assigned one unit per dwelling unit unless otherwise noted by MCES. The present availability <br />is $1,408 per unit, but Developer acknowledges the City adjusts the charge annually, and <br />Developer is responsible for payment of the per unit fee in place at the time of approval of a <br />particular phase. <br /> <br />Trunk sewer unit charges addressed under this paragraph are in addition to any SAC <br />charges imposed by Metropolitan Council Environmental Services. <br /> <br />A credit to Developer will be allowed by the City for oversizing and overdepth of sanitary <br />sewer system to serve other properties as reasonably determined by the City Engineer in <br />consultation with Developer’s engineer. <br /> <br />The specific amounts due for trunk and availability charges for each phase of the <br />Development will be confirmed in the subdivision agreement for such phase. <br /> <br />10.2 Trunk Water Connection Fees <br />The City has established trunk water connection fees to uniformly distribute the costs of <br />public trunk water infrastructure. The Trunk Water Connection Fee consists of two components; <br />a Trunk Charge and an Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge for a particular phase shall be paid at the time of subdivision approval of <br />the phase. The present Water Trunk Charge is $2,162 per unit, but the Developer acknowledges <br />the City adjusts the charge annually, and Developer is responsible for payment of the per unit fee <br />in place at the time of approval of a particular phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.