My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-04-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
03-04-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
2/28/2019 4:17:16 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/04/2019
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 <br /> <br />The proposed Lyngblomsten development can be accommodated with existing public <br />services and will not overburden the City’s service capacity. The site is ultimately served <br />by MCES Lift Station L69 and has substantial reserve capacity to accommodate he <br />development in the district. The existing water supply and water distribution system can <br />provide adequate water volume and fire protection upon looping of the system. <br /> <br />Section 1007.024 PUD, Planned Unit Development <br /> <br />Per Section 1007.024(1) Purpose and Intent, the PUD, by allowing deviation from the <br />strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, <br />yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, <br />is intended to encourage: <br /> <br />(a) A development pattern in harmony with the objectives of the <br />Comprehensive Plan. <br /> <br />The proposed Lyngblomsten development is consistent with the goals and policies of the <br />Comprehensive Plan and the Master Planning Study-Hodgson Road & CR J. <br /> <br />(a) Innovations in development that address growing demands for all styles of <br />economic expansion, greater variety in type, design, architectural standards, and siting of <br />structures through the conservation and more efficient use of land in such developments. <br /> <br />The PUD allows implementation of the Master Plan’s vision to create an urban form for <br />the area. Buildings are pulled towards the main collector roads and away from existing <br />residential homes. <br /> <br />(b) The preservation and enhancement of desirable site characteristics such as <br />existing vegetation, natural topography and geologic features and the prevention of soil <br />erosion. <br /> <br />The existing wetland on site will not be impacted. A wetland buffer and conservation <br />easement will provide additional protection of the natural resource. <br /> <br />(c) A creative use of land and related physical development which allows a <br />phased and orderly transition of varying land uses in close proximity to each other. <br /> <br />The proposed Lyngblomsten development transitions from existing low density single <br />family homes to cottage home to a senior living campus consisting of independent living, <br />assisted living and skilled nursing facilities to restaurant and commercial use. Building <br />heights are tiered from single level cottage homes to two, three and then four story senior <br />living campus as the development progresses towards CSAH 49 (Hodgson Road) and CR <br />J (Ash Street). <br /> <br />(d) An efficient use of land resulting in smaller networks of utilities and streets <br />thereby lowering development costs and public investments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.