Laserfiche WebLink
31 <br /> <br />(d) Water supply. A proposed subdivision shall be deemed to have an adequate <br />water supply. <br /> <br />Lyngblomsten will have an adequate water supply. City watermain will be extended from <br />Woodridge Lane through a 20 foot wide utility easement obtained by the City over 255 <br />Ash Street, 275 Ash Street and a portion of the old 49 Club. A 12” watermain extends <br />down the public road and 8” watermain serves the cottage homes, senior living <br />community and commercial areas. Utilities will be stubbed under CSAH 49 (Hodgson <br />Road) and looped to Ravens Court. <br /> <br /> (e) Waste disposal systems. A proposed subdivision shall be served with adequate <br />waste disposal systems. <br /> <br />Lyngblomsten will be served with an adequate waste disposal system. City sanitary sewer <br />force main will be extended from Woodridge Lane through a 20 foot wide utility <br />easement obtained by the City over 255 Ash Street, 275 Ash Street and a portion of the <br />old 49 Club. A lift station is also required. A 4” sanitary sewer is shown to service the <br />area as well. The 4” sanitary sewer main shall be revised to a larger more adequately <br />sized pipe. Utilities will be stubbed under CSAH 49 (Hodgson Road) to serve future <br />development to the east. <br /> <br />Planning & Zoning Board <br /> <br />The Planning & Zoning Board held a public hearing on February 13, 2019. Public <br />comments were overall positive with some concerns regarding buffers and landscaping <br />screening and traffic. The Planning & Zoning Board voted 6-0 in favor of the rezoning <br />and PUD Development Stage Plan/Preliminary Plat for Lyngblomsten. <br /> <br />Summary <br /> <br />Lyngblomsten is proposing to development a senior living community consisting of 20 <br />single family cottage homes, 100 independent living units, 50 assisted-living units and 48 <br />skilled nursing care units. Future development includes a restaurant and commercial <br />building. The proposed development meets the goals, objectives and standards of the <br />Comprehensive Plan and the Master Plan. The intersection is a major gateway into the <br />city and has been a high priority redevelopment area over the past 20 years. The site has <br />been the focus of several proposed commercial/residential development proposals. <br />However it has proven to be a challenge for development/redevelopment due to lack of <br />public utilities and transportation infrastructure, high neighborhood expectations and <br />timing. The senior living community will support and catalyze future commercial <br />development in the area, including the restaurant planned by this developer. <br /> <br />PUD flexibility for building setbacks will provide benefits such as increased buffer from <br />the Woodridge Lane neighborhood and implementation of the Master Plan’s urban form <br />vision. Additional PUD benefits include higher architectural single family home <br />standards, increased landscaping, clubhouse amenities, wetland buffer and public road <br />right-of-way. <br />